Investor Presentaiton
ZD
Boundiali...encouraging drill results along strike
of Fonondara
BARRICK
Infill VTEM
Detailed VTEM over 45km corridor
SANI TARGET
Wide system confirmed with higher grades:
20m @ 1.43g/t from 30m (incl. 5m @ 4.79g/t from 35m)
24m @ 1g/t from 0m (incl. 5m @ 2.61g/t); 8m @ 11.74g/t from 2m
(incl. 1m @ 70g/t)
KATI NORTH
New drilling defined 500m-long zone of potential immediately
west of Fonondara
Modeling ongoing
FONONDARA
KOLO TARGET
5km
■ 12 targets generated and prioritized
New drilling returned narrow mineralization
No follow up planned
KATIERE TARGET
Shallow drilling confirms 3 subparallel structures, 1.25km strike, first
identified from Au-in-soil at 100ppb: 20m @ 1.5g/t from 0m
(incl. 3m @ 5.08g/t); 24m @ 1.19g/t from 11m (incl. 4m @ 2.33g/t)
Follow up RC planned
5 tested with shallow AC program; encouraging results along strike of Fonondara
■ Program continuing to optimally test Fonondara structure for conclusionView entire presentation