Investor Presentaiton slide image

Investor Presentaiton

ZD Boundiali...encouraging drill results along strike of Fonondara BARRICK Infill VTEM Detailed VTEM over 45km corridor SANI TARGET Wide system confirmed with higher grades: 20m @ 1.43g/t from 30m (incl. 5m @ 4.79g/t from 35m) 24m @ 1g/t from 0m (incl. 5m @ 2.61g/t); 8m @ 11.74g/t from 2m (incl. 1m @ 70g/t) KATI NORTH New drilling defined 500m-long zone of potential immediately west of Fonondara Modeling ongoing FONONDARA KOLO TARGET 5km ■ 12 targets generated and prioritized New drilling returned narrow mineralization No follow up planned KATIERE TARGET Shallow drilling confirms 3 subparallel structures, 1.25km strike, first identified from Au-in-soil at 100ppb: 20m @ 1.5g/t from 0m (incl. 3m @ 5.08g/t); 24m @ 1.19g/t from 11m (incl. 4m @ 2.33g/t) Follow up RC planned 5 tested with shallow AC program; encouraging results along strike of Fonondara ■ Program continuing to optimally test Fonondara structure for conclusion
View entire presentation