Investor Presentaiton slide image

Investor Presentaiton

COMPANY OVERVIEW (Cont'd) Customer Summary of major on-going projects Stung Tatay - Phnom Penh Transmission System Alex Corporation Project duration April 2017 April 2021 Contract value Status USD100.2 million 62.8%^ Outstanding contract value^^ USD37.3 million Okvau Transmission Substation Renaissance Minerals (Cambodia) Ltd Mar 2020 Mar 2021 USD 7.3 million Construction commenced in March 2020 USD 7.3 million PESTECH Oddor Meanchey - East Siem Reap ODM Power Line Co., Ltd. June 2020 May 2022 - USD50.0 million Construction yet to commence USD50.0 million Scope Notes: RHB⭑ Λ • Design, engineering, installation, testing and commissioning of the 230kV transmission line of approximately 220km from the Stung Tatay Hydro Power Plant to the proposed new Bek Chan substation in Phnom Penh; and • Supply, installation and connection of two (2) 230kV line bays at Stung Tatay Hydro Power Plant Supply, design, construction, erection, installation, testing, commissioning, energisation and handover of 230/11kV Okvau Transmission Substation Supply, design, construction, erection, installation, testing, commissioning, energisation and handover of 230kV transmission line from Oddor Meanchey to East Siem Reap Grid Substation switchyard Completion rate for the project as at 31 December 2019 ΑΛ Outstanding contract value: contract value yet to be billed as at 31 December 2019 8
View entire presentation