A Long Term Geothermal Strategy Over sixty years of development 980 MW & 7,500 GWhr Annual Generation (GWh/year) 10,000 9,000 8,000 7,000 6,000 Nga Awa Purua 140MW, Te Huka 23 MW (2010) Ngawha 2, 15MW Kawerau 100MW, KA24 8.3MW (2008) Wairakei Bin 14.4MW. Mokai 2 39MW (2005) Rotokawa Ext Te Mihi 166 MW (201 Ngatamariki 82M TOPP1 25MW (2013) 6MW (2003) 5,000 Kawerau Mokai TG2 55MW 4,000 3.5MW Ohaaki (1999) (1993) Wairakei TPP 114MW, 3,000 192MW 8MW Kawerau TG1 Mokai 1A 17MW (2007) (1958-64) (1966) 2.4MW (1989) 2,000 Ngawha 10MW (1998) Rotokawa 29MW (1997) 1,000 Wairakei BP 5MW, Poihipi 50MW (1996) 0 1950 1960 1970 1980 1990 2000 2010 2020