Atlantic Operations Overview slide image

Atlantic Operations Overview

Atlantic - Goldboro East Signal Gold Inc. Goldboro Project Significant Result 2022 Drill Collar Interpreted Fault Anticline Previous Collar Mineralised Belt Proposed Pit BR-22-370 3.0m @ 3.91g/t Au from 169m Goldbrook Road BR-22-358 1.2m @ 33.82g/t Au from 48m incl. 0.5m @ 80.30g/t Au from 48m BR-22-354 2.5m @ 18.71g/t Au from 13m incl. 0.5m @ 85.30g/t Au from 14m Goldboro East, Nova Scotia FY24 Planned Drilling EG-23-002 New Brunswick Prince Edward Island Nova Scotia Location Bridgewater Yarmouth ÉG-23-004 EG-23-006 EG-23-001 EG-23-003 Halifax Sydney * Goldboro East 5 006 500mN • An initial diamond drill program comprising 4 holes for 800m has been designed to test the Goldboro East target The drilling is designed to test for shallow eastern extensions to Signal Gold's Goldboro deposit (a ~3.0 Moz Au Open Pit and Underground NI 43-101 Resource) BR-22-344 1.0m @ 3.09g/t Au from 21m 2.7m @ 3.50g/t Au from 45m incl. 0.7m @ 12.40g/t Au from 45m BR-22-345 . 3.0m @ 11.40g/t Au from 35m incl. 0.5m @ 60.50g/t Au from 36m . BR-22-370 3.0m @ 1.31g/t Au from 149m BR-22-348 6.0m @ 0.55g/t Au from 104m 0.5m @ 15.30g/t Au from 140m 4.6m @ 0.85g/t Au from 168m MR Corridor 015 Drawn May 2023 607 500mE BR-22-350 6.1m @ 0.83g/t Au from 27m 6.5m @ 0.53g/t Au from 51m ° C BR-22-349 686-230 EG-23-011 REG-23-008 EG-23-010 EG-23-007 EG-23-009 EG-23-005 EL 10621 Signal Gold Ground 8.7m @ 1.36g/t Au from 20m incl. 1.0m @ 7.75g/t Au from 28m 1.7m @ 0.79g/t Au from 124m 2.8m @ 1.01g/t Au from 157m 608 000mE 100m UTM Zone 20 SBM Tenement Area Planned Drilling Phase 1 Phase 2 Gold Prospect Topography Provincial Road Lakes/Drainage 5 006 000mN 13 11
View entire presentation