Investor Presentaiton
"King of the Mills" in the Leonora district
•
KOTH process plant is the lowest cost
mill in the Leonora district
Large mill drives site-wide economies
of scale
30MW hybrid gas-solar power
Operating up to 5.5Mtpa rate
. Future low-capital expansion potential
Red 5 is evaluating optimal mill
throughput expansion and options
to accelerate open pit mining
Potential for mill throughput to
exceed current rates without any
major capital expenditure
Major driver to unlock value for
regional consolidation
Regional process plants - mill size, unit cost and distance to Leonora
Processing Costs (A$/t)
60
50
40
Gwalia (GMD)
30
Mt Morgans
(GMD)
20
20
10
Duketon South
(RRL)
Thunder Box
(NST)
Duketon North
(RRL)
King of the Hills
0
50
100
150
200
1.
Red 5 ASX Release: 26 July 2023
www.red5limited.com
Distance from Leonora (km)
Bubble size (graph) = annualised mill throughput
Sources: All comparative data sourced from public company disclosures
Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence
Page: 16View entire presentation