The anticipated life of the project is approximately 25-30 years, but could be extended
through replacing, retrofitting, and repowering.
•
Before and during operations, Dakota Range III will coordinate with local and county emergency
management to protect the public and project facilities in the event of natural, manmade, or other
incidents.
Dakota Range III will register each turbine location and the O&M facility with the rural
identification/addressing (fire number) and 911 systems.
• At the end of the project's life, decommissioning will be the responsibility of Dakota Range III.
Financial assurances, as a protection, will be put in place as required by state and county
authorities. Decommissioning will end after the project area is restored.