Post-Construction and Safety Commitments The anticipated life of the project is approximately 25-30 years, but could be extended through replacing, retrofitting, and repowering. • Before and during operations, Dakota Range III will coordinate with local and county emergency management to protect the public and project facilities in the event of natural, manmade, or other incidents. Dakota Range III will register each turbine location and the O&M facility with the rural identification/addressing (fire number) and 911 systems. • At the end of the project's life, decommissioning will be the responsibility of Dakota Range III. Financial assurances, as a protection, will be put in place as required by state and county authorities. Decommissioning will end after the project area is restored. 15 APEX CLEAN ENERGY