Investor Presentaiton
Revitalization of the Oswaldo Cruz Bridge
The concessionaire started the modernization
of the Oswaldo Cruz Viaduct, in Maré, which
connects the expressway to Ilha do Fundão. After
the intervention, the bridge will support loads of
45 tons, almost double the current limit. Capacity
will increase by 87.5%, given the increased demand
for heavy trucks going to the Technological Park
of the Federal University of Rio and to the West
Zone, enhancing the capital's logistics network.
Approximately one thousand tons of steel and
concrete will be used to modernize and reinforce
the entire structure, 200 meters long and 27
meters wide, with a total of 5,400 square meters.
■ 45 tonnes
"
87.5% increase in capacity
■ A thousand tonnes of steel and concrete
Construction on the
Oswaldo Cruz Bridge
PERI UP
Cixo
EA
|
Contents
Message from the CEO
Message from the Board
Covid-19
About this Report
Invepar
Invepar Management
Excellence in Services
Supply Management
Engineering Management
Awards and Recognition
Highlights
Invepar Airports
Invepar Urban Mobility
Invepar Toll Roads
Risk and Compliance
Management
Sustainability Management
Personnel Management
Economic and
Financial Performance
Credits
64
GRI Index
2019 AR inveparView entire presentation