Investor Presentaiton slide image

Investor Presentaiton

Business Operations Hydro/Dams / Tunnels / Irrigation : Scope: Construction of concrete, earth fill and rock fill dams and tunnels Key Projects Executed: ...(4) Diversified into construction of hydro projects by undertaking 150 MW pumped storage plant near Mumbai for Tata Power Laying of Water Trunk Main from Garden Reach Water Works to Taratala Valve Station and Laying of Sewer Line along Diamond Harbour Road by Microtunelling Method for KEIIP Projects under Execution: Investigation Design and execution of water conveyor system consisting of lined gravity canal, CM & CD works tunnels for Telangana Government Laying of Trunk Sewer along James Long Sarani by Microtunneling Method, Kolkata Development of S&D Network in Churial Extension Canal sub basin including laying of main trunk sewer by micro tunneling method and construction of Churial Extension Pumping Station for KEIIP. Providing and Laying Sewage Trunk main by Micro Tunnelling Method on Ashram Road from Wadaj Circle to Existing RCC Box on Riverfront of AMC Area for Ahmedabad Municipal Corporation Construction Of Adits 6 in Connection With New Single Broad Guage Rail Link Between Rishikesh And Karanprayag - Uttarakhand Construction of Tunnels (T9-T10, T-3, T-4 & T-6) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project Order Book: Outstanding order book of INR 22,134 million as on December 31, 2020 Page 25
View entire presentation