Investor Presentaiton slide image

Investor Presentaiton

Big One in Focus TIMELINE . • ° 1970 Forsyth Minerals drill shallow drillholes. 1992 MIM Exploration conduct additional geochemical investigations. 1993 2020 2021 Savanah Resources conduct additional on ground studies, including rock chip sampling. . Castillo Copper drill 41 drillholes ⚫ (including 1 DD drillhole) over two phases for a total of 4330.98m. 2021 Fender Geophysics complete a 5 line, 50m dipole-dipole (DP-DP) Induced Polarisation (IP) survey spread over 4,550m. ⚫ Geochemical study and aerial drone survey of 12 historic stockpiles 2022 Western Australian Minerals drill 27 drillholes ⚫ and estimate a non-JORC compliant copper oxide target of 79,000t at 2.2%. 2007 1981 Carpentaria Exploration Company conduct stream ⚫ sediment and soil sampling. 1994 - 1996 Coffee Mining NL re-open historic mine workings. • . • 1997 Mining operations suspended due to a downturn in copper ⚫ prices. 2018 Castillo Copper granted EMP 26574. Maiden MRE released [2.1Mt @ 1.1% Cu]. ⚫ Metallurgical test-work by ALS. 2023 Pit optimisation study by Entech. NWQ COPPER PROJECT - INVESTOR PRESENTATION 13
View entire presentation