Rebidding for the road stretch for Via 040 In 2017 the Via 040 group requested adherence to the process of amicable return of the infrastructure concessions, in accordance with Law 13.448/17, regulated by Decree 9.957/19 of the Federal Government, which allows a new auction to be held. The return request was unanimously approved by the National Land Transport Agency (ANTT) and validated by the Ministry of Infrastructure and the Investment Partnership Program Council. Via 040 will continue providing operation and maintenance services until the rebidding is completed, guaranteeing safety and traffic standards for the BR-040. Since taking over the concession in 2014, until December 2019, Via 040 has invested R$ 1.5 billion in works, equipment and services for users. In the same period, R$ 1.5 billion was collected, with a loss of R$ 751 million, including operating costs. For the maintenance and operation of the road in this period, it was necessary to resort to extra contributions from the shareholders of the Invepar group, to the order of R$ 1 billion. Even with these difficulties, the highway is in much better condition, according to quality surveys by the National Transport Confederation (CNT). There was also a reduction of about 40% in the number of fatal accidents. Among the investments, the company built 73 km of extra lanes in areas that had an approved environmental license. It also repaired the asphalt surface over a distance that twice exceeds the extension granted, in addition to installing more than 20 thousand new signposts. The 21 service stations built saw more than 440 thousand visits, including the delivery of 19 babies. Every day, about 240 users receive assistance from the company. During the period of operation, the Via 040 group encountered a very different scenario from before the time of bidding process, held in 2013. The conditions in place at that time were drastically affected by factors beyond the concessionaire management control i.e. lack of BNDES participation in the long-term financing of the necessary investments and the late issuing of environmental licenses for construction works. In addition, the severe crisis caused a reduction in economic activity across the country, significantly impacting the reduction in cargo and passenger traffic. Toll road stretch under the Via 040 concession Contents Message from the CEO Message from the Board Covid-19 About this Report Invepar Invepar Management Excellence in Services Supply Management Engineering Management Awards and Recognition Highlights Invepar Airports Invepar Urban Mobility Invepar Toll Roads Risk and Compliance Management Sustainability Management Personnel Management Economic and Financial Performance Credits GRI Index | 68 2019 AR invepar
View entire presentation