Investor Presentaiton slide image

Investor Presentaiton

Eldorado Brasil Turns Ten The company marks its first decade of operation (although the lead-up to its founding started two years earlier) boasting 11 years' worth of production in the space of 10, and a pioneering, successful and innovative track record. Eldorado Brasil is founded on June 15th. After the groundbreaking ceremony, construction begins on the Três Lagoas (MS) mill R$ 6.2 billion invested in forests, logistics, and the mill The company acquires Florestal Brasil S/A and expands its forestry estate. 2010 2011 2012 The world's largest and most modern eucalyptus pulp mill, featuring a single-line layout, starts operation in the municipality of Três Lagoas. Eldorado is certified by the Forest Stewardship CouncilⓇ (FSC) for forestry manage- ment (FSC-C113536) and chain of custody (FSC-C113939) e Eldorad Bra 2017 2016 Eldorado Brasil is awarded a permit from the Brazilian power sector regulator, ANEEL, to build the Onça Pintada power plant project. The plant generates green and renewable electricity from biomass consisting of previously discarded wood chips, roots, and stumps. The company is also recertified by the Forest Stewardship CouncilⓇ (FSC®) for forestry management (FSC-C113536) and chain of custody (FSC-C113939). 2015 Our dedicated terminal at the Port of Santos (SP). starts operation. Eucalyptus harvesting is discontinued in the state of São Paulo, with forestry operations now concentrated in Mato Grosso do Sul. The company reaches a85% mechanization rate in forestry operations, one of the highest in the industry. Production exceeds 1.6 million tons of pulp. 2014 The company sets its first operational performance record, producing 1.568 million metric tons of pulp. In the second year of operation, the mill exceeds its design production capacity. Eldorado becomes the first forestry company in Brazil to employ artificial intelligence in forest inventories. Eldorado achieves self-sufficien- cy for pulpwood, ensuring an adequate supply of raw material to the mill. 2013 In its first year of operation, the mill reaches its design production capacity of 1.5 million metric tons per year. antecipa que Equipe resultados em 10 Eldorado Brasil The mill exceeds its design capacity by 22% with 95% operational efficiency and 98% availability-setting a benchmark in the industry. Eldorado Brasil's eucalyptus operations are certified by CERFLOR for forestry management and by PEFC for chain of custody 2018 Our permitted power exports to the national grid increase from 40 MWh to 50 MWh. The company secures the construction license for the Onça Pintada power station. 2019 Construction begins on the R$ 13 million allocated to our Covid-19 response Onça Pintada power station, with an installed capacity of 50 MW/h. The permitted capacity under the Operation License for the Mill increases to 1,830,508 t/year 2020 Eldorado is successful in its bid for the STS14 area in the Port of Santos (SP), increasing our shipping capacity to 3 million metric tons per year. Eldorado Brasil becomes a signatory of the UN Global Compact, and pledges support for 17 Sustainable Development Goals (SDGs). The Onça Pintada power plant is completed. The Onça Pintada power plant starts operation, producing clean and renewable energy. Construction begins on the new terminal at the Port of Santos (SP). Eldorado participates in the 26th Conference of the Parties (COP-26), actively contributing to discussions on the climate emergency and the role that industry can play in combating climate change. 50 MW/h in renewable installed capacity 2021 2022 11 years in 10 As we celebrate our 10th anniversary, Eldorado Brasil sets a new production record of 16.5 million metric tons, a year ahead of target and an industry first in the global pulp market. Eldorado deploys artificial intelligence and autonomous equipment throughout its operations. The company is recommended for an additional five years of certification by the Forest Stewardship CouncilⓇ (FSC-C113536) and the Brazilian Forestry Certification Program (CERFLOR) We are also recommended for recertification against the Forest Stewardship CouncilⓇ (FSC®) Chain of Custody Standard (FSC-C113939) and by the Program for the Endorsement of Forest Certification (PEFC) Our Onça Pintada plant ends its first year of operation with a total output of 127,000 megawatt-hours of clean electricity generated from eucalyptus waste. Work progresses on the port terminal in Santos. At year-end 2022, the works are 98% complete. Eldorado Brasil The Eldorado 8 Foreword Sustainability Report 2022 Way Corporate Governance Planet People Stewardship GRI Content Index 9▶
View entire presentation