Investor Presentaiton
Eldorado Brasil
Turns Ten
The company marks its first decade of operation
(although the lead-up to its founding started two
years earlier) boasting 11 years' worth of
production in the space of 10, and a pioneering,
successful and innovative track record.
Eldorado Brasil is
founded on June 15th.
After the
groundbreaking
ceremony, construction
begins on the Três
Lagoas (MS) mill
R$ 6.2 billion
invested in forests,
logistics, and the mill
The company
acquires Florestal
Brasil S/A and
expands its
forestry estate.
2010 2011 2012
The world's largest and most
modern eucalyptus pulp mill,
featuring a single-line layout,
starts operation in the
municipality of Três Lagoas.
Eldorado is certified by the
Forest Stewardship CouncilⓇ
(FSC) for forestry manage-
ment (FSC-C113536) and
chain of custody
(FSC-C113939)
e
Eldorad
Bra
2017
2016
Eldorado Brasil is awarded a permit from the Brazilian power
sector regulator, ANEEL, to build the Onça Pintada power plant
project. The plant generates green and renewable electricity
from biomass consisting of previously discarded wood chips,
roots, and stumps. The company is also recertified by the Forest
Stewardship CouncilⓇ (FSC®) for forestry management
(FSC-C113536) and chain of custody (FSC-C113939).
2015
Our dedicated terminal at the
Port of Santos (SP). starts
operation. Eucalyptus harvesting
is discontinued in the state of São
Paulo, with forestry operations
now concentrated in Mato Grosso
do Sul. The company reaches
a85% mechanization rate in
forestry operations, one of the
highest in the industry.
Production exceeds 1.6 million
tons of pulp.
2014
The company sets its first
operational performance record,
producing 1.568 million metric
tons of pulp. In the second year of
operation, the mill exceeds its
design production capacity.
Eldorado becomes the first
forestry company in Brazil to
employ artificial intelligence in
forest inventories.
Eldorado achieves self-sufficien-
cy for pulpwood, ensuring an
adequate supply of raw material
to the mill.
2013
In its first year of operation, the
mill reaches its design
production capacity of 1.5
million metric tons per year.
antecipa
que
Equipe
resultados
em
10
Eldorado
Brasil
The mill exceeds its design
capacity
by 22%
with 95% operational
efficiency and 98%
availability-setting a
benchmark in the industry.
Eldorado Brasil's
eucalyptus
operations are
certified by
CERFLOR for
forestry
management and by
PEFC for chain of
custody
2018
Our permitted power exports to the
national grid increase from 40 MWh
to 50 MWh. The company secures
the construction license for the
Onça Pintada power station.
2019
Construction begins on the
R$ 13 million
allocated to our Covid-19 response
Onça Pintada power station, with
an installed capacity of 50 MW/h.
The permitted capacity under the
Operation License for the Mill
increases to 1,830,508 t/year
2020
Eldorado is successful in
its bid for the STS14 area
in the Port of Santos (SP),
increasing our shipping
capacity to 3 million
metric tons per year.
Eldorado Brasil becomes
a signatory of the UN
Global Compact, and
pledges support for 17
Sustainable Development
Goals (SDGs). The Onça
Pintada power plant is
completed.
The Onça Pintada power
plant starts operation,
producing clean and
renewable energy.
Construction begins on the
new terminal at the Port of
Santos (SP). Eldorado
participates in the 26th
Conference of the Parties
(COP-26), actively
contributing to discussions
on the climate emergency
and the role that industry
can play in combating
climate change.
50 MW/h
in renewable
installed capacity
2021
2022
11 years in 10
As we celebrate our 10th anniversary, Eldorado Brasil sets a
new production record of 16.5 million metric tons, a year ahead
of target and an industry first in the global pulp market.
Eldorado deploys artificial intelligence and autonomous
equipment throughout its operations.
The company is recommended for an additional five years of
certification by the Forest Stewardship CouncilⓇ
(FSC-C113536) and the Brazilian Forestry Certification
Program (CERFLOR)
We are also recommended for recertification against the Forest
Stewardship CouncilⓇ (FSC®) Chain of Custody Standard
(FSC-C113939) and by the Program for the Endorsement of
Forest Certification (PEFC)
Our Onça Pintada plant ends its first year of operation with a
total output of 127,000 megawatt-hours of clean electricity
generated from eucalyptus waste.
Work progresses on the port terminal in Santos. At year-end
2022, the works are 98% complete.
Eldorado Brasil
The Eldorado
8
Foreword
Sustainability Report 2022
Way
Corporate
Governance
Planet
People
Stewardship
GRI Content
Index
9▶View entire presentation