Investor Presentaiton slide image

Investor Presentaiton

KOTH Ore Reserve of 2.5Moz¹ Total KOTH Ore Reserves as at June 2023 Cut-off Deposit Mining Method (g/t) JORC 2012 Classification Tonnes (Mt) Gold (g/t) Contained Gold (Moz)² KOTH Open pit 0.4 Proved 4.6 0.8 0.1 KOTH Open pit 0.4 Probable 54.2 1.2 2.0 KOTH Underground 1.4 Probable 2.5 1.8 0.1 Rainbow Open pit 0.3 Probable 2.1 0.8 0.05 Centauri Open pit 0.3 Probable 0.3 1.2 0.01 Cerebus & Eclipse Open pit 0.3 Probable 1.5 1.0 0.05 Total 65.2 1.2 2.4 1. Red 5 ASX Release: 7 September 2023. Total Reserve of 2.5Moz includes broken stockpiles. 2. Totals may not balance due to rounding. www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence Page: 22
View entire presentation