Investor Presentaiton slide image

Investor Presentaiton

HONEYMOON RESOURCE Significant existing high-grade resources - highest grade amongst ASX listed peers 2016 Honeymoon Project Mineral Resource Covering the Honeymoon, East Kalkaroo and Brooks Dam Deposits Reported Above a preferred 250ppm eU3Og lower cut-off. Million eU₂Og Contained U3O8 Contained U3O8 Classification Tonnes ppm (M Kg) (M Lb) Measured 1.7 1720 2.95 6.51 Indicated 1.5 1270 1.92 4.24 Inferred 12.0 640 7.62 16.8 Total 15.2 820 12.50 27.56 Note: Figures have been rounded. Quoted resources have been adjusted to exclude previous production of approximately 335t of U308. 6