Atlantic Operations Overview
Sorowar - Pigiput Trend
209 700mN
surface
Productive
Window
Pit Design
Simberi Planned Drilling: Sorowar-Pigiput Trend
Cross Section Srpt 1 Bearing 35° Looking NW +20m
SORRC028
26m @ 2.8g/t Au from 56m to EOH
--
27
?
Potential Extension
? Potential Extension
Simberi - Sorowar-Pigiput Trend
Planned Drilling Programmes
Borowit
Simberi
EL609 Island
Location Simberi
Pigibo
Pigiput
Sorowar
Planned Drilling Programmes
ResDev Drilling
Exploration Drilling
*Exploration Target
FY24 Sulphide Target Work Area
Mined Pit Outline
Pit Design Outline.
Resource Outline
(indicated and infer
Sorowar-Pigiput
Trend
43250m
Pigiput ME
SOROWAR MINED PIT
MINED
120SORDGC010
35m @ 3.1g/t Au from 67m
Resource Model &
Downhole Au Results
> 4.00 g/t Au
2.50 -4.00 g/t Au
1.00 -2.50 g/t Au
0.75 -1.00 g/t Au
Drilling
0.50 -0.75 g/t Au
0.25 -0.50 g/t Au
0.10 -0.25 g/t Au
200m
TI Local Grid
Planned Exploration Drill Hole
Significant Result
Previous DD & RC Drilling
Exploration Model
>2.0g/t Au
>1.0 - 2.0g/t Au
Potential Extension
Resource & Mining
Indicated or Measured
Inferred or Unclassified
Pit Design
=
Ore Type Arsenic
100mR
OmRL
-100mRL
-200m RL-
100m
Ti Local Grid
Srpt 3
Srpt 10
Srpt 11
Sorowar Cross Section looking
Northwest
Gold and multi-
element geochemical studies
highlight that the best developed
and highest grade gold on the
mine lease generally occurs in a
"Productive Window" between -
25m RL and +75m RL
Drilling is targeting down dip of
high-grade intercepts that extend
outside of pit design
17View entire presentation