Mining performance confirms long-term mine plan
9,500N
10,000N
825m
10,500N
King of the Hills Open Pit Ore Reserves
11,000N
195m
STAGE 1
Present to FY2026
Reserve (Mt)
7.8
STAGE 2
Grade (g/t)
1.0
Present to FY2031
Contained Au (Moz)
0.2
Strip Ratio (W:O)
3.7
Reserve (Mt)
16.6
STAGE 3
Grade (g/t)
1.0
FY2025 to FY2034
Contained Au (Moz)
0.6
Strip Ratio (W:O)
5.4
Reserve (Mt)
11.7
Grade (g/t)
1.2
Contained Au (Moz)
0.5
Strip Ratio (W:O)
5.7
Z
200m
Current open pit and surface
1. Topography, designs and figures as at 30 June 2023.
2. Discrepancy in summation may occur due to rounding.
3. Figures quoted for 'Strip Ratio' are derived from the Life-of-Mine plan, which includes Inferred Mineral Resources
www.red5limited.com
2,330m
STAGE 4
FY2027 to FY2037
Reserve (Mt)
14.4
Grade (g/t)
1.2
Contained Au (Moz)
0.6
Strip Ratio (W:O)
5.9
1,225m
Stockpiles and ROM of 4.2Mt
at 0.5g/t for 0.1Moz as at 30 June 2023
400m
1.
Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence
STAGE 5
FY2028 to FY2037
Reserve (Mt)
8.3
Grade (g/t)
1.2
Contained Au (Moz)
0.3
Strip Ratio (W:O)
10.8
Red 5 ASX Release: 7 September 2023