Investor Presentaiton slide image

Investor Presentaiton

Mining performance confirms long-term mine plan 9,500N 10,000N 825m 10,500N King of the Hills Open Pit Ore Reserves 11,000N 195m STAGE 1 Present to FY2026 Reserve (Mt) 7.8 STAGE 2 Grade (g/t) 1.0 Present to FY2031 Contained Au (Moz) 0.2 Strip Ratio (W:O) 3.7 Reserve (Mt) 16.6 STAGE 3 Grade (g/t) 1.0 FY2025 to FY2034 Contained Au (Moz) 0.6 Strip Ratio (W:O) 5.4 Reserve (Mt) 11.7 Grade (g/t) 1.2 Contained Au (Moz) 0.5 Strip Ratio (W:O) 5.7 Z 200m Current open pit and surface 1. Topography, designs and figures as at 30 June 2023. 2. Discrepancy in summation may occur due to rounding. 3. Figures quoted for 'Strip Ratio' are derived from the Life-of-Mine plan, which includes Inferred Mineral Resources www.red5limited.com 2,330m STAGE 4 FY2027 to FY2037 Reserve (Mt) 14.4 Grade (g/t) 1.2 Contained Au (Moz) 0.6 Strip Ratio (W:O) 5.9 1,225m Stockpiles and ROM of 4.2Mt at 0.5g/t for 0.1Moz as at 30 June 2023 400m 1. Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence STAGE 5 FY2028 to FY2037 Reserve (Mt) 8.3 Grade (g/t) 1.2 Contained Au (Moz) 0.3 Strip Ratio (W:O) 10.8 Red 5 ASX Release: 7 September 2023 11,500N 5,000 Elev- Page: 12
View entire presentation