Investor Presentaiton
2022 at a Glance
RECORD
10-year production of
16.5 million
metric tons, producing
11 years' worth of pulp a
year in advance.
EFFICIENCY
Our mill operates 22%
above its design capacity,
within an operational
efficiency of 95%.
We have continued
to maintain 98%
availability levels, setting a
benchmark in the industry.
FORESTRY 5.0
Launched Forest 5.0
project, a project to
implement advanced
analytics and sensor
technology in our
machinery and forestry
operations to collect
real-time data
on tree growth.
MORE JOBS
We ended the year with a
workforce of
5,312
employees.
PRODUCTION
1.83 million
metric tons
of pulp
ECONOMIC
PERFORMANCE
R$ 7.5 billion
in net revenue, R$ 3.5
billion in net income and
R$ 4.6 billion in adjusted
EBITDA.
AWARD
Presented with the 2022 Proteção
Brasil Award by Revista Proteção in the
"Occupational Health and Safety Training
and Communication" category for the
Midwest. This prestigious award recognizes
outstanding practices in promoting force
health and safety in the forestry sector.
RAILWAY
Awarded a permit by the National Land
Transportation Agency (ANTT) to build
an 88.9 kilometer railway line from our
mill in Três Lagoas (MS) to Aparecida do
Taboado (MS). In a projected investment
of R$ 890 million, the new railway line will
transport an estimated 1.8 million metric
tons of pulp per year.
ONCA PINTADA
POWER STATION
our thermal power station in
Três Lagoas (MS) generated
127,162.87 MWh
of electricity from waste
eucalyptus wood.
ENVIRONMENTAL
PROTECTION
30% reduction
in area affected by fires
compared to 2021,
through the use of
preventive measures and
technology.
NEW TERMINAL
Started construction of
a new terminal at the
Port of Santos (SP) that
will triple our shipping
capacity and reduce
logistics costs.
Eldorado Brasil
18
Foreword
Sustainability Report 2022
The Eldorado
Way
Corporate
Governance
Planet
Stewardship
People
GRI Content
Index
19View entire presentation