Building of Marginal Bauru
There was increased flow of traffic on the João
Baptista Cabral Rennó Highway (SP-225) after
the completion of the Bauru marginal heading
west. The road project started in June and lasted
six months. The stretch was drained and paved,
and signals and safety equipment installed. The
new periphery road guarantees greater safety
for residents of local condominiums and other
drivers who use the SP-225 to access Bauru,
Piratininga or other destinations in the region.
Changes at Km 643 and 650
Increased convenience and safety for drivers who
travel through km 643 of SP-270, in Caiuá, and
km 650 of SP-270, in Presidente Epitácio. Cart
delivered two slip roads in these stretches, allowing
greater fluidity and accessibility. The construction
started in March and lasted eight months. The
work is part of the road network modernization
project managed by the concessionaire.
Slip road
viaduct over Cart
Contents
Message from the CEO
Message from the Board
Covid-19
About this Report
Invepar
Invepar Management
Excellence in Services
Supply Management
Engineering Management
Awards and Recognition
Highlights
Invepar Airports
Invepar Urban Mobility
Invepar Toll Roads
Risk and Compliance
Management
Sustainability Management
Personnel Management
Economic and
Financial Performance
Credits
GRI Index
| 71
2019 AR inveparView entire presentation