Investor Presentaiton slide image

Investor Presentaiton

Building of Marginal Bauru There was increased flow of traffic on the João Baptista Cabral Rennó Highway (SP-225) after the completion of the Bauru marginal heading west. The road project started in June and lasted six months. The stretch was drained and paved, and signals and safety equipment installed. The new periphery road guarantees greater safety for residents of local condominiums and other drivers who use the SP-225 to access Bauru, Piratininga or other destinations in the region. Changes at Km 643 and 650 Increased convenience and safety for drivers who travel through km 643 of SP-270, in Caiuá, and km 650 of SP-270, in Presidente Epitácio. Cart delivered two slip roads in these stretches, allowing greater fluidity and accessibility. The construction started in March and lasted eight months. The work is part of the road network modernization project managed by the concessionaire. Slip road viaduct over Cart Contents Message from the CEO Message from the Board Covid-19 About this Report Invepar Invepar Management Excellence in Services Supply Management Engineering Management Awards and Recognition Highlights Invepar Airports Invepar Urban Mobility Invepar Toll Roads Risk and Compliance Management Sustainability Management Personnel Management Economic and Financial Performance Credits GRI Index | 71 2019 AR invepar
View entire presentation