Investor Presentaiton slide image

Investor Presentaiton

Appendix E - Mercator AOI Significant Intercepts¹ TARGET Type Drill Hole* Drill Results from Q4 2018 Azimuth Dip Including Interval (m) Width (m) Au (git) Interval (m) Width (m) Au (g/t) Mercator RC MTRC001 086 -50 83-84 1.0 3.9 Mercator RC MTRC002 088 -48 51-53 20 N 25 Mercator RC MTRC003 092 -50 143-160 17.0 1.0 Mercator RC MTRC003 092 -50 165-166 1.0 4.9 Mercator RC MTRC003 092 -50 74-76 20 1.2 Mercator RC MTRC003 092 -50 4-7 3.0 0.5 Mercator RC MTRC004 092 -50 18-27 9.0 1.5 Mercator RC MTRC005 093 -50 127-150 23.0 1.6 Mercator RC MTRC005 093 -50 34-35 1.0 0.9 Mercator RC MTRC006 090 -47 105-106 1.0 1.5 Mercator RC MTRC006 Mercator RC MTRC006 Mercator RC MTRC006 090 -47 84-98 14.0 0.7 090 -47 57-58 1.0 0.6 090 -47 64-65 1.0 1.5 Mercator RC MTRC007 089 -49 108-132 24.0 1.4 Mercator RC MTRC007 089 -49 72-74 20 20 Mercator RC MTRC007 089 -49 89-95 6.0 0.8 Mercator RC MTRC009 082 -48 114-115| 1.0 0.5 Mercator RC MTRC009 Mercator RC MTRC009 Mercator RC MTRC010 Mercator RC MTRC010 Mercator RC MTRC010 Mercator RC MTRC012 Mercator RC MTRC012 082 -48 75-77 20 24 082 -48 17-21 4.0 0.4 088 -50 108-124 16.0 3.7 109-110 1.0 088 -50 146-151 5.0 0.7 088 -50 9-15 6.0 23 9-10 1.0 090 -49 65-81 16.0 1.3 74-75 1.0 090 -49 28-32 4.0 0.7 44.1 BARRICK 1. All intercepts calculated using a 0.5g/t Au cutoff and are uncapped; minimum intercept width is 2m; internal dilution is less than 25% total width. 2. Mercator drill hole nomenclature: MT (Mercator) followed by type (RC: Reverse Circulation) with no designation of the year. 3. True width of intercepts are uncertain at this stage. 4. Includings defined as any interval with a weighted average Au g/t equal to or greater than 5g/t. The drilling results for the Nielle property contained in this presentation have been prepared in accordance with National Instrument 43-101 -Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. 6.5 Sample preparation and analyses are conducted by an independent laboratory. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Nielle property conform to industry accepted quality control methods. 5.2
View entire presentation