Investor Presentaiton slide image

Investor Presentaiton

AVCB In 2019, the Fire Department Inspection Certification (AVCB) for the Passenger Terminal 3 was renewed and, in early 2020, the Passenger Terminal 1 certification was issued. The document attests that the Concessionaire meets the standards for firefighting. The process of issuing the AVCB to Passenger Terminal 2 is underway. Ágile In 2019, GRU Airport completed one year of the Ágile Project, carrying out the operations of landings and takeoffs simultaneously under visible weather conditions. The project was developed to provide greater efficiency in air traffic management and to contribute to and optimize the work of controllers and ground staff. Its effective implementation allowed an increase in the runway capacity to 57 movements/hour, an increase of 4% compared to 2018. The procedure was developed in conjunction with the Airspace Control Department (DECEA), the Brazilian Association of Airlines (ABEAR), GRU Airport, the Brazilian Airport Infrastructure Company (INFRAERO) and the International Air Transport Association (IATA), with support from the National Civil Aviation Agency (ANAC). New routes 26 new routes were launched, 10 new national destinations and five international (three of which to cities hitherto not connected to GRU Airport). GRU Airport in Numbers 43 million passengers 3 passenger terminals + 41 airlines with scheduled flights (passengers and cargo) m m 393 mil m² of 292 thousand landings and takeoffs area constructed 336 commercial outlets (passenger terminal) Contents Message from the CEO Message from the Board Covid-19 About this Report Invepar Invepar Management Excellence in Services Supply Management Engineering Management Awards and Recognition Highlights Invepar Airports Invepar Urban Mobility Invepar Toll Roads Risk and Compliance Management Sustainability Management Personnel Management Economic and Financial Performance Credits GRI Index 301.500 m² of runway 100 mil m² covered area, the largest cargo terminal in South America 33,000 m³ refrigerator storage, 22 cool rooms | 42 2019 AR invepar
View entire presentation