Investor Presentaiton slide image

Investor Presentaiton

Evelyn Dam Drilling CSA Global considered EVE001 was indicative of distal IOCG alteration that upgrades the Evelyn Dam target 662350 North 180469400 50 mm STELAR METALS Pink Carbonate Fluorite Vein M STELAR METALS with chlorite rims STELAR METALS Native Copper Reduction Zone with filamentous Cu and S Oxidized Pandurra Sandstone Evelyn Dam Drill Core - EVE001 at 276m depth Single existing hole. (EVE001) driled by Rio Tinto in 2018 Failed to test anomaly (drilled vertically ~2km from modelled gravity anomaly Top of basement at 430m depth (GRV) with visible native copper and brecciated contact 50 mm Sericite altered Rhyolite With flow texture Evelyn Dam Drill Core - EVE001 at 691m depth Sericite-Chlorite-haematite alteration and carbonate- fluorite veining towards end of hole 10
View entire presentation