Nordgold: A High Growth International One Million Ounce Gold Producer slide image

Nordgold: A High Growth International One Million Ounce Gold Producer

Large-Scale Gross Mine Gross - Brief Overview and Summary Project parameters Location Location Infrastructure Mine type Start-up date Average production LOM average AISC Russia, Yakutia 5 km from Taborny operating mine, accessible by all-season road Open pit, Heap leach September 2018 200+ koz US$760/oz Gross mine general view Project Highlights Gross is the largest Nordgold mine - it produced 259.2 koz in 2019 exceeding its 2019 production outlook of 230-235 koz. The mine has large resource base with about 17 years life of mine. The Gross mine World class ore body: 9.7 Moz at 0.67 g/t in MI&I Mineral Resources and 4.4 Moz at 0.72 g/t in Ore Reserves (as per 31 December 2017) Straightforward low cost heap leach metallurgy with high recovery rate at about 82.5% Project has excellent economics with the costs in the 1st quartile of the cost curve and IRR of almost 40% at $1250 gold price 12 nordgold more than gold
View entire presentation