Investor Presentaiton slide image

Investor Presentaiton

B BANK INDONESIA BANK SENTRAL REPUBLIK INDONESIA A INTERNAL FLOOD CONTROL SYSTEM DRANASE LEDENCA DRAINAGE STING DRAINAGE RENCANA RENGANA KANAL RETEN -KANAL RETENSI MEDAN JALAN RUANG TERBUKA MAU RUANG TERBUKA BAU KOLAN RETING SESUAI ADAL ATH HUTAN UNDUNG ATHATTAN AREAS ATH NODE & LANCARK JALUR HAU MEDANJALAN JALLA HUU KORDOATERJALAN 000 LAUTER BUNGA RTH AKTIF TAMAN TOL 3 TAMAN REKREASI HUTAN LINDUNG 5 2 KOLAM RETENSI KANAL RETENSI KORIDOR TEROWONGAN AIR & 7 POMPA PENDORONG 4 PROJECT OFFERED IRON & STEEL IDR 114 Billion 5 Budget Year Plan 2021 to 2024 (Multiyears) Source of Funds / Funding Scheme 7YYYYYYYY 799 Location Direct Investment In Medan Industrial Estate area at Pulau Batam Street Land Allocation KANAL RETENSI 6 Description • It is scattered because according to its pipe and track plan Existing canal repair (11,012 m) Addition of existing capacity (7,341 m) • New canal (5,900 m) • Sedimentation / drainage control (15,015 m) •⚫ Transfer pump (4 units) • Median retention canal (2,900 m) Drainage cell (36,707 m) Retention pool (5 Ha) wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww. Mylywwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww. wwwwwwEAAAA North Sumatra Investment Book 69 69
View entire presentation