Investor Presentaiton
PRE-FEASIBILITY STUDY HIGHLIGHTS
"Project significantly de-risked with Pre-Feasibility Study confirming highly robust financials."
MINING AND PROCESSING
Initial Mine Life (Years)
Mining Rate (Mtpa)
PRODUCTION
8
1
249
LOM Lead Metal Production (kt)
LOM Silver Metal Production (Moz)
9.35
FINANCIAL
Pre-Production Capital (A$M)
95.4
Steady-State Average Cash Flows (A$M)
60
KPI ANALYSIS
US$
A$
Operating Cost $/lb Lead with Silver
Credits
0.06
0.09
NPV Pre-Tax (A$M)
243
IRR Pre-Tax (%)
62
Payback from Commercial Production (months)
16
8 Year Initial Mine Life
1 Mtpa Mining Rate
NPV, A$243M
IRR 62%
CAPEX A$95.4M
Average Cashflow A$60M
Capital Payback in 16 Months
Source: PMY ASX announcements 26 March 2019
Pacifico confirms that all material assumptions underpinning the production target or the forecast financial information referenced on 26 March 2019, continue to apply and have not materially changed.
PACIFICO MINERALS LIMITED ASX:PMY