PRE-FEASIBILITY STUDY HIGHLIGHTS "Project significantly de-risked with Pre-Feasibility Study confirming highly robust financials." MINING AND PROCESSING Initial Mine Life (Years) Mining Rate (Mtpa) PRODUCTION 8 1 249 LOM Lead Metal Production (kt) LOM Silver Metal Production (Moz) 9.35 FINANCIAL Pre-Production Capital (A$M) 95.4 Steady-State Average Cash Flows (A$M) 60 KPI ANALYSIS US$ A$ Operating Cost $/lb Lead with Silver Credits 0.06 0.09 NPV Pre-Tax (A$M) 243 IRR Pre-Tax (%) 62 Payback from Commercial Production (months) 16 8 Year Initial Mine Life 1 Mtpa Mining Rate NPV, A$243M IRR 62% CAPEX A$95.4M Average Cashflow A$60M Capital Payback in 16 Months Source: PMY ASX announcements 26 March 2019 Pacifico confirms that all material assumptions underpinning the production target or the forecast financial information referenced on 26 March 2019, continue to apply and have not materially changed. PACIFICO MINERALS LIMITED ASX:PMY Pacifico Minerals Ltd ASX:PMY 9