Investor Presentaiton slide image

Investor Presentaiton

GOVERNMENT PROGRAM FOR RE DEVELOPMENT The Indonesian government is targeting an additional 38 GW of NRE Installed capacity by 2035 Accelerating the use of renewable energy power plant, where solar power plant will be prioritized because of its relatively cheaper investment costs and short. installation duration. NRE Acceleration Efforts: ○ Primary Final Energy Substitution, by utilizing the existing technology; B30-B50, co-firing, RDF utilization. О Fossil Primary Energy Conversion, converting Diesel PP or Coal Powered PP into NRE PP, biogas, and pellet for cooking. ○ Increasing NRE Capacity, to meet the new demand; focus on the development of Solar PP Utilization of Non-Electric NRE / Non-Biofuel such as briquettes and drying of biogas agricultural products In addition, developments for off-grid and Rooftop Solar PV for households and industries are also under way. RE Total Capacity (GW) 18 15 13 10 10 11 RE Target 48 45 43 41 39 37 35 Geothermal 32 30 27 24 Bioenergy Wind + Nuclear 23% Solar PV Hydro PP 2019 2021 2023 2025 2027 2029 2031 2033 2035 Source: Draft of Grand Strategy Energy National www.esdm.go.id f Kementerian Energi dan Sumber Daya Mineral @Kementerian ESDM @kesdm Kementerian ESDM
View entire presentation