Investor Presentaiton
Appendix A - Sani Target
Significant Intercepts 1
Drill Results from Q4 2018
7.0 - 14.0
19.0-21.0
5.0 - 13.0
22.0-28.0
4.0 - 7.0
5.0 - 10.0
1.0-6.0
4.0 - 7.0
9.0-11.0
-50
15.0 - 20.0
-50
0.0 - 13.0
SNAC028 280
-50
18.0 - 22.0
Including
TARGET Type Drill Hole Azimuth Dip Interval (m) Width (m) Au (g/t) Interval (m) Width (m) Au (g/t)
Sani AC SNAC005 280 -50
Sani AC SNAC020 280 -50
Sani AC SNAC022 280 -50
Sani AC SNAC022 280 -50
Sani AC SNAC023 280 -50
Sani AC SNAC024 280 -50
Sani AC SNAC025 280 -50
Sani AC SNAC026 280 -50
Sani AC SNAC026 280 -50
Sani AC SNAC027 280
Sani AC SNAC028 280
Sani AC
7.0
1.41
2.0
0.56
8.0
1.25
6.0
1.38
3.0
0.59
5.0
0.76
5.0
0.78
3.0
0.72
2.0
1.21
5.0 2.18
13.0
Sani
AC SNAC029 280
-50
3.0 - 10.0
7.0
1.39
4.0 0.89
13.40
7.0-10.0
3.00
6.37
Sani
AC SNAC047 290
-50
9.0 - 14.0
5.0
0.85
Sani
AC SNAC047 290
-50
26.0 - 29.0
3.0
1.94
27.0 - 28.0
1.00
5.46
Sani
AC SNAC056 290
-50
10.0
13.0
3.0
2.34
Sani
AC
SNAC056 290
-50
31.0 -35.0
4.0
0.50
Sani
AC
SNAC057 290 -50
35.0 - 40.0
5.0
4.79
36.0 39.0
3.00
6.73
Sani AC SNAC059 290 -50
Sani AC SNAC066 290 -50
Sani AC SNAC066 290 -50
Sani AC SNAC066 290 -50
Sani AC SNAC066 290 -50
Sani AC SNAC066 290 -50
Sani
AC SNAC070 290 -50
1.0-3.0
2.0 2.78
0.0 - 5.0
5.0 1.41
9.0-12.0
3.0
0.97
14.0 17.0
3.0
0.86
20.0-23.0
3.0
0.64
34.0 36.0
14.0 - 16.0
2.0 0.66
2.0 1.16
BARRICK
1. All intercepts calculated using a 0.5g/t Au cutoff
and are uncapped; minimum intercept width is 2m;
internal dilution is less than 25% total width.
2. Sani drill hole nomenclature: SN (Sani) followed by
type (AC: Air Core) with no designation of the year.
3. True width of intercepts are uncertain at this stage.
4. Includings defined as any interval with a weighted
average Au g/t equal to or greater than 5g/t.
The drilling results for the Sani target contained in
this presentation have been prepared in accordance
with National Instrument 43-101 -Standards of
Disclosure for Mineral Projects. All drill hole assay
information has been manually reviewed and
approved by staff geologists and re-checked by the
project manager. Sample preparation and analyses
are conducted by an independent laboratory.
Procedures are employed to ensure security of
samples during their delivery from the drill rig to the
laboratory. The quality assurance procedures, data
verification and assay protocols used in connection
with drilling and sampling on the Sani target conform
to industry accepted quality control methods.View entire presentation