Investor Presentaiton slide image

Investor Presentaiton

New opportunities at Mankono... while Sissedougou permit being renewed Dokeka Togola Gbongogo Bafretou South Lokolo 5.5km 3.8km BARRICK ■ Soil extended towards north Results pending ■ Trenches and shallow AC drilling completed Multiple potential zones intersected ■ Results pending Strong soil anomaly over 6km Immediate extension of Morondo Trenches showed deformation and alteration which hosts grade Morondo (Orca) BAFSTR002 9m @ 0.45g/t (incl. 3m @ 0.95g/t and 1.5m @ 1.24g/t). Weak results due to deep weathering. AC results pending 34.1 Mt @ 1.1g/t for 1.2 Moz (cut off 0.7g/t)
View entire presentation