Darlot adding value as satellite mine
Darlot benefiting from
development
investment and
reduced cost base
FY25 & 26 mine plan
locked in
Second jumbo
scheduled in H2FY24
FY24 focus on
Resource conversion
Middle Walters South1
4.4m at 16.0g/t
Centurion1
. 4.6m at 30.7g/t
Burswood1
•
1.8m at 15.0g/t
•
2.4m at 12.5g/t
- 1,500RL
- 1,300RL
- 1,100RL
- 900RL
- 700RL
Darlot Underground Drilling FY24 Planned Drilling
Moses
ASS
Middle Walters
Dar-Cent
South
CAX0075
follow-up
As-built open pit surface
Current underground workings
Underground mine design
Drilling planned for FY24
Darlot key growth areas
1. Topography, designs and figures as at 30 June 2023.
Chappell
Lower Burswood
Thompson
Boon West
Burswood Nth
950m below surface
Oval
1.
Red 5 ASX Release: 13 November 2023
www.red5limited.com
Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence
200m
1,500RL-
1,300RL-
1,100RL-
900RL -
700RL-
500R-