Investor Presentaiton slide image

Investor Presentaiton

Toll Roads Equivalent Paying Vehicles (VEPS): 244.4 million ■ 19,800 cubic meters of asphalt covering on our highways ■ 115,768 mechanical assistance call- outs on the group highways ■18,548 medical assistance call- outs on the group highways Implementation of a pioneer system in the country for the control and management of highways (SGR) ■ Incentives to reduce accidents on the Belo Horizonte ring road - Aliança Pela Vida (Alliance for Life) Project Inspection operation of heavy vehicles on the Ring Road Campaign for the safety of motorcyclists, against kite-line accidents Operation to improve flow at Km 0.8 DF, in Santa Maria, on Via 040. Traffic jams reduced by more than 60% "Mining road stretch": improvements at km 565, 566,567, 568 and 608 of Via 040, for road safety and better traffic flow ■ 34% reduction in accidents involving animals on the CLN road 72% reduction in accidents involving animals on the CART road Reconstruction of the Lamsa toll station Beginning of the revitalization and expansion of the capacity of the Oswaldo Cruz Bridge on the Yellow Line Beginning of the rehabilitation works for embankments at CLN ■ISO 9001 certification in maintenance processes in all controlled concessions Contents Message from the CEO Message from the Board Covid-19 About this Report Invepar Invepar Management Excellence in Services Supply Management Engineering Management Awards and Recognition Highlights Invepar Airports Invepar Urban Mobility Invepar Toll Roads Risk and Compliance Management Sustainability Management Personnel Management Economic and Financial Performance Credits GRI Index Maintenance work on the bridge over the Capivara River - Km 26.5 of CLN | 39 2019 AR invepar
View entire presentation