Investor Presentaiton
Toll Roads
Equivalent Paying Vehicles (VEPS): 244.4 million
■ 19,800 cubic meters of asphalt
covering on our highways
■ 115,768 mechanical assistance call-
outs on the group highways
■18,548 medical assistance call-
outs on the group highways
Implementation of a pioneer system in the country
for the control and management of highways (SGR)
■ Incentives to reduce accidents on the Belo Horizonte
ring road - Aliança Pela Vida (Alliance for Life) Project
Inspection operation of heavy vehicles on the Ring Road
Campaign for the safety of motorcyclists,
against kite-line accidents
Operation to improve flow at Km 0.8
DF, in Santa Maria, on Via 040. Traffic
jams reduced by more than 60%
"Mining road stretch": improvements at
km 565, 566,567, 568 and 608 of Via 040,
for road safety and better traffic flow
■ 34% reduction in accidents involving
animals on the CLN road
72% reduction in accidents involving
animals on the CART road
Reconstruction of the Lamsa toll station
Beginning of the revitalization and expansion of the
capacity of the Oswaldo Cruz Bridge on the Yellow Line
Beginning of the rehabilitation works
for embankments at CLN
■ISO 9001 certification in maintenance
processes in all controlled concessions
Contents
Message from the CEO
Message from the Board
Covid-19
About this Report
Invepar
Invepar Management
Excellence in Services
Supply Management
Engineering Management
Awards and Recognition
Highlights
Invepar Airports
Invepar Urban Mobility
Invepar Toll Roads
Risk and Compliance
Management
Sustainability Management
Personnel Management
Economic and
Financial Performance
Credits
GRI Index
Maintenance work on the bridge over
the Capivara River - Km 26.5 of CLN
|
39
2019 AR inveparView entire presentation