Investor Presentaiton
Growth potential for KOTH mine¹
. Resource definition
and grade control
drilling continues to
deliver high-grade
assays
•
26.0m at 168.15g/t
T
9,000N
9,500N
10,000N
•
•
16.5m at 16.50g/t
•
16.4m at 10.62g/t
·
29.5m at 5.11g/t
•
75.4m at 1.83g/t
Grade control drilling
1
10,500N
King of the Hills open pit
production (1985-2004, 2022-2023)
32.8Mt @ 1.7g/t Au, 1.8Moz
contained gold
11,000N
11,500N
12,000N
5,500 Elev-
Taramoola open pit - 285m
5,000 Elev-
South pit
underground exploration
Final FFS pit design - 400m
Resource
definition
Resource
definition
Resource
definition
Final UG design - 540m
now complete for
over 85% of the FY24
mine plan
. Potential to extend
along the Regal and
Eastern Flanks
King of the Hills
underground production
(2011-2017, 2018-2023)
4.6Mt @ 3.2g/t Au, 0.5Moz
contained gold
Final open pit design (Stages 1 to 5)
Current underground workings
Underground mine design
Existing drillholes
OPEN
OPEN
Tarmoola Granodiorite
1. 1985-2017 production history compiled from various sources, including quarterly and annual reports to the ASX.
2. Production, post 2017, compiled from Red 5 Limited's reconciliations as at 30 June 2023.
3. Due to rounding, the totals may not correspond with the sum of individual production statistics.
1.
Red 5 ASX Release: 8 August 2023
www.red5limited.com
Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence
500m
Exploration
area
OPEN
4,500 Elev
Page: 13View entire presentation