Investor Presentaiton slide image

Investor Presentaiton

Growth potential for KOTH mine¹ . Resource definition and grade control drilling continues to deliver high-grade assays • 26.0m at 168.15g/t T 9,000N 9,500N 10,000N • • 16.5m at 16.50g/t • 16.4m at 10.62g/t · 29.5m at 5.11g/t • 75.4m at 1.83g/t Grade control drilling 1 10,500N King of the Hills open pit production (1985-2004, 2022-2023) 32.8Mt @ 1.7g/t Au, 1.8Moz contained gold 11,000N 11,500N 12,000N 5,500 Elev- Taramoola open pit - 285m 5,000 Elev- South pit underground exploration Final FFS pit design - 400m Resource definition Resource definition Resource definition Final UG design - 540m now complete for over 85% of the FY24 mine plan . Potential to extend along the Regal and Eastern Flanks King of the Hills underground production (2011-2017, 2018-2023) 4.6Mt @ 3.2g/t Au, 0.5Moz contained gold Final open pit design (Stages 1 to 5) Current underground workings Underground mine design Existing drillholes OPEN OPEN Tarmoola Granodiorite 1. 1985-2017 production history compiled from various sources, including quarterly and annual reports to the ASX. 2. Production, post 2017, compiled from Red 5 Limited's reconciliations as at 30 June 2023. 3. Due to rounding, the totals may not correspond with the sum of individual production statistics. 1. Red 5 ASX Release: 8 August 2023 www.red5limited.com Our CORRE Values: Courage, Ownership, Respect, Reliability, Excellence 500m Exploration area OPEN 4,500 Elev Page: 13
View entire presentation