Investor Presentaiton slide image

Investor Presentaiton

West ◉ PFS PIT DRILLING " 118,864 metres drilled since first discovery hole 64,423m DD HQ diameter 41,170m RC 5.5 inch bit 13,271m RC Grade Control Mineralisation 350 metres wide Deposit open and continues at depth Plan view 1150m 350m 54000N Cross Section - Grade Distribution 15000E 350m 15500E Starter Pit 250m Gold (g/t Au) < 0.3 0.3 to 0.5 0.5 to 0.8 0.8 to 1.0 Open Life of Mine pit 1.0 to 2.0 ≥2.0 CARDINAL RESOURCES ORL 400m ASX/TSX: CDV | 13 -200RL East 200RL CARDINAL RESOURCES
View entire presentation