Investor Presentaiton

Made public by

sourced by PitchSend

1 of 21

Creator

PitchSend logo
PitchSend

Category

Pending

Published

Unknown

Slides

Transcriptions

#1CARDINAL RESOURCES GHANA - WEST AFRICA 4.76 Moz MAIDEN ORE RESERVE ASX TSX: CDV - Investor Presentation | October 2018 NV#2CORPORATE OVERVIEW Gold Fields (Australia) 11.2% ASX Capital Structure TSX 1832 Asset Current Share Price1 A$ 0.45 Management LP (Canada) Shares on Issue2 378 M 10.8% 114 M Van Eck (USA) 7.5% A$ 170 M A$ 162 M A$ 38 M Listed Options on Issue 3,4 Market Capitalisation Enterprise Value Cash at Bank5 1. As at 29 October 2018 2. 60 Class C Performance shares on issue. If converted, will total 6 million ordinary shares if certain milestones are achieved. Details of conversion milestones are provided in Cardinal's Annual Report 3. Exercise price of A$ 0.15, Expiry date 30 Sept 2019 4. Additional 35,294,200 unlisted options on issue with various expiry dates and exercise prices 5. Cash as at 30 June 2018 includes Debt of US$ 25M completed in August 2018. Royal Bank of Canada (Canada) 7.1% Sprott (Canada) 5.0% Expert Coverage Ave Average A$ 1.16 per share 157% Beacon Securities (Canada) BMO Capital Markets (Canada) Clarus Securities (Canada) Cormark Securities Hartleys RFC Ambrian (Canada) (Australia) (United Kingdom) Commonwealth SHAREHOLDERS Bank Australia (Australia) 4.8% Directors 4.3% CARDINAL RESOURCES Other 42.5% Aga Nola (Switzerland) 3.0% US Global (USA) 4.0% SHAREHOLDERS BY GEOGRAPHIC LOCATION Europe 15.0% United Kingdom 3.3% Other 9.6% North America 37.7% Australia 34.4% ASX/TSX: CDV | 2 CARDINAL RESOURCES#3CARDINAL RESOURCES BOARD & MANAGEMENT CEO - MD ARCHIE KOIMTSIDIS Project Developer Former Deputy Country Manager Ghana at PMI Gold (now Asanko Gold) ■ Ghanaian resident Executive Director MALIK EASAH Alluvial Gold Miner Former ■ Public Relations Officer Ghana at PMI Gold (now Asanko Gold) ■ Ghanaian citizen Project Manager BRUCE LILFORD Metallurgist Former ■ Senior Study Manager at Amec Foster Wheeler (now Wood Group) Non Executive Chairman - KEVIN TOMLINSON Investment Banker & Geologist Former ■ Director Centamin plc ■ Director Orbis Gold ■ Chairman Medusa Mining Current ■ Non-Exec Chair Xanadu Mines ■ Non-Exec Director Samco Gold ■ Non-Exec Chair Infinity Lithium Non-Executive Director Non Executive Director - DR. KENNETH G. THOMAS MICHELE MUSCILLO Project Implementation Former ■ Senior Vice President - Barrick Gold Corporation ■ Past President, CIM Current ■ Non-Exec Continental Gold Corporate Lawyer Former ■ Non - Exec Director Orbis Gold (now SEMAFO) Current ■ Non - Exec Director Aeris Resources ■ Non - Exec Director Xanadu Mines Non-Executive Director ROBERT SCHAFER Geologist/Mineral Economist Former Executive, manager and field geologist Billiton, BHP, Kinross and Hunter Dickinson ■ Past President, PDAC & CIM Current Director Canadian Mining Hall of Fame, Director USA National Mining Hall of Fame ASX/TSX: CDV | 3 CARDINAL RESOURCES#4MINE SCALE REGIONAL GEOLOGY ■ Namdini is located within the Birimian terrane of Northeastern Ghana which is 2.1-2.2 billion years old ■ Unconformable Volta Basin sediments obscure the great majority of Birimian terrane in eastern and central Ghana 4Moz B2Gold Younger rocks Eburnean granitoids Tarkwaian sedimentary Birimian volcanic rocks Birimian sedimentary Archean basement Archean greenstone 6.6Moz IAMGOLD 3Moz Avocet CARDINAL RESOURCES NIGER 5Moz Nordgold 5.7Moz OreZone BURKINA FASO 5.8Moz B2Gold 2Moz Avesoro 2.2Moz Endeavour MALI 7.8Moz Semafo 6.4Moz Resolute 5Moz Randgold GUINEA IVORY COAST 5Moz Kinross Cardinal 7Moz Resource 4.76Moz Reserve TOGO GHANA 23Moz Newmont 7Moz Resolute 5.9Moz Asanko 60Moz AngloGold 8Moz Newmont 7Moz Perseus LIBERIA 18Moz Golden Star 13Moz Gold Fields 25Moz Gold Fields 100 km 23Moz AngloGold Discovery gold ounces quoted on map ASX/TSX: CDV | 4 CARDINAL RESOURCES#5NEW FRONTIER: NORTHERN GHANA ■ Paleoproterozoic Granite-Greenstone Belt o Underexplored compared to Southern Ghana ■ Well-Established Local Infrastructure ○ 30km - National HV hydro grid power ○ 7km - Continuous water supply - White Volta River 。 25km - Sealed national highway ■ Excellent Community Relationships o Facilitates rapid development objective ■ Open Savannah Grassland o Low population density ■ Mining License Granted for 15 years renewable AFRICA Côte d'Ivoire Burkina Faso MNG Gold Bolgatanga BOLGATANGA PROJECTS O(Formerly Endeavour Mining) NAMDINI PROJECT Black Volta White Volta 2 hr Drive to Cardinal Office Tamale N GHANA 100 kilometres Sunyani Newmont Legend SUBRANUM PROJECT Mines Resolute Mining O City Kinross Kumasi Asanko Gold Newmont Cardinal Licences Obuasi Anglogold Ashanti Koforidua CARDINAL Ho RESOURCES Benin Togo CARDINAL RESOURCES Tano Perseus Golden Star Gold Fields ACCRA སྩ Tema Volta Cape Coast Takoradi Gulf of Guinea ASX/TSX: CDV | 5#6MAIDEN ORE RESERVE 4.76 Moz CARDINAL RESOURCES KEY ECONOMIC RESULTS UNIT 9.5 Mtpa ☐ PFS FINANCIALS Study Consultants o Golder Associates 。 Lycopodium o Knight Piesold o ALS Laboratory Oreway Mineral Consultants o IMO Metallurgical Consultants o MPR Geological Consultants ○ 9.5 Mtpa option selected on best economic return All in Sustaining Costs (AISC)¹ Total Project Payback Post-Tax NPV (@ 5% discount)² Pit Design 1,105 Gold Price US$/ oz Financial Model 1,250 Development Capital Cost US$ M 414 (including 15% contingency and owners costs) Starter Pit Life of Mine 599 US$/ oz 769 years 1.8 US$ M 586 Post-Tax IRR Table Notes: 1 Cash Costs + Royalties + Levies + Life Of Mine Sustaining Capital Costs (World Gold Council Standard) 2 Royalties calculated at a flat rate of 5% - subject to negotiation and corporate tax rate of 35% was used subject to negotiation % 38 ASX/TSX: CDV | 6 CARDINAL RESOURCES#79.5 Mtpa CARDINAL RESOURCES KEY ESTIMATED PRODUCTION RESULTS UNIT Gold Produced PFS PRODUCTION SUMMARY ☐ Maiden Ore Reserve 4.76 Moz ■ Starter Pit yielding ~900 koz ☐ gold with 0.5: 1 strip ratio Life of mine strip ratio of 1.4 : 1 Mineralisation 1.1 km long and 350m wide ■ >10,000 oz ounce per vertical metre at 0.5 g/t cut-off ■ New conventional gold plant inclusive of conventional flotation and regrind to CIL Table Notes: Gold Price – Financial Model - Gold Produced (Average for full production years) 1 Gold Head Grade Gold Recovery Ore Mined (0.5 g/t cut-off grade) Strip Ratio Mine Life (Inc ramp-up and mine closure) Development Capital Cost (Including 15% contingency and owners costs) 1 Excludes ramp-up and for the Life of Mine scenario mine closure (Years where full production is not realised) Starter Pit Life of Mine US$ / oz 1,250 (oz/yr) 361,000 294,000 (oz) 907,000 3,975,000 g/t Au 1.31 1.14 % 86 84 Tonnes 24,000,000 129,600,000 W:O 0.5 1 1.4 1 years 2.5 14 US$ M 414 ASX/TSX: CDV | 7 CARDINAL RESOURCES#8PROBABLE ORE RESERVE CARDINAL RESOURCES NAMDINI Cut off Tonnes Grade MAIDEN ORE RESERVE September 2018 (g/t Au) 0.5 (Mt) 129.6 (g/t Au) Metal (Moz Au) 1.14 4.76 ■ 4.76 Moz Au contained in 129.6 Mt at 1.14 g/t Au at a cut-off of 0.5 g/t Au Probable Ore Reserve ■ 6.5 Moz Au contained in 180 Mt at 1.13 g/t Au at a cut-off of 0.5 g/t Au Indicated Mineral Resource ■ 0.5 Moz Au contained in 13 Mt at 1.2g/t Au at a cut-off of 0.5 g/t Au Inferred Mineral Resource ■ Remains open along strike and down dip The Ore Reserve conforms with and uses JORC Code 2012 recommendations and Canadian Institute of Mining, Metallurgy and Petroleum "CIM Definition Standards for Mineral Resources and Mineral Reserves" (CIM, 2014). No inferred material has been used in the Ore Reserve estimates. Appropriate modifying factors have been considered, these include but are not restricted to mining, processing, metallurgical, infrastructure, economic marketing, legal, environmental, social and governmental factors. Cut off (g/t Au) 0.5 Cut off (g/t Au) 0.5 INDICATED MINERAL RESOURCE Tonnes Grade Metal (Mt) 180 (g/t Au) 1.1 (Moz Au) 6.5 INFERRED MINERAL RESOURCE Tonnes (Mt) 13 Grade (g/t Au) 1.2 0.5 Metal (Moz Au) This is in accordance with the guidelines of Reasonable Prospects for Eventual Economic Extraction ("RPEEE") per the Canadian Institute of Mining, Metallurgy and Petroleum "CIM Definition Standards for Mineral Resources and Mineral Reserves" (CIM, 2014) and the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code 2012). The Mineral Resources are inclusive of the Ore Reserve. ASX/TSX: CDV | 8 CARDINAL RESOURCES#9FINANCIAL SENSITIVITY After-Tax IRR (%) Sensitivity 46% 9.5 Mtpa 42% 38% 34% 29% $1,350 $1,300 $1,250 $1,200 $1,150 After-Tax NPV @ 5% Sensitivity $758 $672 $586 $501 $1,350 $1,300 $1,250 $1,200 $1,150 ASX/TSX: CDV | 9 $415 CARDINAL RESOURCES CARDINAL RESOURCES#10RELATIVE VALUATION EV / Au Eq. Resources (US$/oz) $69 $36 $22 CARDINAL RESOURCES EV / Au Eq. Reserves (US$/oz) Cardinal Peer Average Producer Average 2 $33 Source: FactSet and company disclosure. Notes: Resources shown inclusive of reserves and on attributable basis. Au Eq. based on long-term consensus metal prices. 1 Includes 18 gold development companies with reserves. 2 Includes 41 junior and intermediate gold producers. 3 Includes 28 gold development companies with resources. $93 $184 Cardinal Peer Average 1 Producer Average 2 ASX/TSX: CDV | 10 CARDINAL RESOURCES#11DEVELOPING A TIER-ONE ASSET 4.76 Moz Au Probable Ore Reserve at 1.14 g/t Cut-off grade - 0.5 g/t Au ◉ Large scale single open pit FLAGSHIP NAMDINI PROJECT • Strip ratios: ○ Starter Pit 0.5 : 1 o Life of Mine 1.4 : 1 ■ Reserve o Mineral Resource to Ore Reserve conversion 73% ■ Metallurgy - N 86% in Starter Pit and 84% overall LOM recovery with optimisation ongoing o Conventional crush-grind-float-regrind- CIL circuit ■ Mining License granted ◉ o 15 years renewable Environmental permitting in progress o EIA Scoping Report submitted to EPA NAMDINI DEPOSIT 3.2km Namdini Mining Licence Boundary (yellow) ASX/TSX: CDV | 11 CARDINAL RESOURCES 7.2km CARDINAL RESOURCES#12PFS PIT DESIGNS US$ 1,105 / oz North О Starter Pit Low strip ratio (0.5 : 1) Contains 1.06 Moz @ 1.31 g/t Open Concentration of higher grade gold from surface 。 Capex payback - 1.8 years. О О Life of Mine Pit Low strip ratio (1.41) Probable Ore Reserve of 4.76 Moz @ 1.14 g/t Au Plan view 1150m 15000mE 350m Starter Pit 53500mN Long Section - Grade Distribution 1150m 53000mN 53500N 250m Gold (g/t Au) < 0.3 0.3 to 0.5 Life of Mine pit Open 53000mN 0.5 to 0.8 0.8 to 1.0 1.0 to 2.0 ≥2.0 CARDINAL RESOURCES ASX/TSX: CDV 12 South 200RL 400m -200RL ORL CARDINAL RESOURCES#13West ◉ PFS PIT DRILLING " 118,864 metres drilled since first discovery hole 64,423m DD HQ diameter 41,170m RC 5.5 inch bit 13,271m RC Grade Control Mineralisation 350 metres wide Deposit open and continues at depth Plan view 1150m 350m 54000N Cross Section - Grade Distribution 15000E 350m 15500E Starter Pit 250m Gold (g/t Au) < 0.3 0.3 to 0.5 0.5 to 0.8 0.8 to 1.0 Open Life of Mine pit 1.0 to 2.0 ≥2.0 CARDINAL RESOURCES ORL 400m ASX/TSX: CDV | 13 -200RL East 200RL CARDINAL RESOURCES#14PFS 9.5 Mtpa PROCESS FLOWSHEET Conventional crush- grind-float-regrind-CIL circuit Gravity gold circuit designed for free gold 15-17 g/t Au concentrate produced Processing 8% of the ROM feed beyond flotation Discharging 92% of the ROM feed to tailings Gold doré bars produced on-site s s صلح 9.5 Mtpa RoM Feed CARDINAL RESOURCES Sag Mill Ball Mill Primary Crushing Crushed Ore Stockpile Regrind Circuit -8% Concentrate to Regrind Flotation Concentrate Circuit CIL Circuit 8 طح (0.76 Mtpa) Grinding Circuit - 15 17 g/t Au concentrate produced Cyclone Classification 92% (8.74 Mtpa) Discharged to Tailings Storage Facility Gravity Concentration. Circuit Elution Electrowinning Gold Doré Bars Production On-Site ASX/TSX: CDV 14 CARDINAL RESOURCES#15Highly prospective land package totals ~900km² and provides significant exploration upside DISTRICT EXPLORATION DISTRICT EXPLORATION#16DISTRICT INITIATIVES ■ Bongo ○ Auger soil drilling planned and geophysics targets being evaluated ■ Kungongo ◉ o 4.5 km strike length being evaluated ○ Positive assay results returned from first pass drilling ○ 3,000 metre drill plan to commence Q4 2018 Ndongo o 6 large scale targets identified with initial focus near major regional shear o Recent exploration identified a discovery at Ndongo East ■ Drill targets being generated 。 Gravity, magnetics and IP being used to identify and refine targets 11°N Bongo Navrongo 1°W 0°30'W Burkina Faso Youga Gold Mine 11°N BOLE BOLGATANGA FAULT ANGA 10°30'N .1°W Kungongo Bolgatanga N10 National Road 45 km NANGODI SHEAR ZONE Historie Nangodi Gold Mine Ndongo NANGODI Shaanxi Mine 25 km to power 7 km to water Namdini N 10 Km 10°30'N 0°30'W Zebilla DISTRICT EXPLORATION#17TIMELINE Resource Update - Completed Metallurgical Optimisation - Ongoing Permitting & Approvals - Ongoing Preliminary Economic Assessment (PEA) - Completed Preliminary Feasibility Study (PFS) - Completed Definitive Feasibility Study (DFS) - To Commence (Anticipated Delivery Q3 - 2019) District Exploration - Resuming post Wet Season (Oct/Nov 2018) CARDINAL RESOURCES 2018 2019 Q1 Q2 Q3 Q4 Q1 ASX/TSX: CDV 17 DISTRICT EXPLORATION#18CARDINAL RESOURCES THANK YOU ASX/TSX: CDV Contact Us: CEO / MD ARCHIE KOIMTSIDIS [email protected] Cannings Purple ANDREW ROWELL [email protected] IR/CORP DEV ALEC ROWLANDS [email protected] Renmark Financial Communications Inc BETTINA FILIPPONE [email protected] ASX/TSX: CDV 18#19CARDINAL RESOURCES APPENDIX: Competent Person's Statement & Disclaimer QUALIFIED PERSON - COMPETENT PERSON'S STATEMENT Mr. Daryl Evans, who is a full time employee of Independent Metallurgical Operations Pty Ltd, is a Qualified Person as defined by National Instrument 43-101- Standards of Disclosure for Mineral Projects ("NI43-101"). Mr. Evans holds a Qualified Professional status being a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr. Evans is an independent consultant appointed by Cardinal. Mr Evans has no economic, financial or pecuniary interest in the company Mr Nicolas Johnson, a member of the Australian Institute of Geoscientists, who is an employee of MPR Geological Consultants Pty Ltd, has compiled the information relating to the Mineral Resources in the Resource Summary of the Namdini Project. Mr Johnson has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person, as defined in the JORC Code and a Qualified Person as defined by the N143-101 instrument. Mr Johnson has no economic, financial or pecuniary interest in the company. Mr. Richard Bray is a Registered Professional Geologist with the Australian Institute of Geoscientists. Mr Bray has compiled the information in this presentation that relates to the Exploration Results and Mineral Resources. Mr. Bray has more than 5 years' experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity which is being undertaken, to qualify as a Competent Person, as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and as a Qualified Person as defined by the NI43-101 instrument. Mr. Bray is a fulltime employee of Cardinal Resources Limited and holds equity securities in the Company. Mr. Ekow Taylor is a Chartered Professional Geologist with the Australasian Institute of Mining and Metallurgy. Mr Taylor has compiled the information in this presentation that relates to the Exploration Results and Mineral Resources. Mr. Taylor has more than 5 years' experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity which is being undertaken, to qualify as a Competent Person, as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and as a Qualified Person as defined by the N143-101 instrument. Mr. Taylor is a fulltime employee of Cardinal Resources Limited and holds equity securities in the Company. Mr Glenn Turnbull, a Competent Person who is a Chartered Engineer and a Member of the Australasian Institute of Mining and Metallurgy and a full-time employee of Golder Associates Pty Ltd has compiled the information relating to the Ore Reserves in the Ore Reserve Summary. Mr Turnbull has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the JORC Code 2012 and is a qualified person for the purposes of N143-101. Mr Turnbull has no economic, financial or pecuniary interest in the company NO NEW INFORMATION This Presentation contains information extracted from ASX and TSX market announcements reported in accordance with the JORC Code (2012) and NI 43-101 and available for viewing at www.cardinalresources.com.au Cardinal Resources Limited ("Cardinal" or the "Company") confirms that it is not aware of any new information or data that materially affects the information included in any original ASX market announcements carried out at the Company's projects and that all material assumptions and technical parameters underpinning the exploration activities and estimates of Mineral Resources in the relevant market announcements continue to apply and have not been materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements. Please also refer to the Company's Annual and Quarterly Reports for further background information which are available on the Company's website. ASX / TSX: CDV | 19#20CARDINAL RESOURCES APPENDIX DISCLAIMER & FORWARD LOOKING STATMENTS FORWARD LOOKING STATEMENTS This presentation contains "forward-looking statements", within the meaning of Section 27A of the United States Securities Act of 1933, as amended and Section 21E of the United States Exchange Act of 1934, as amended and forward-looking information as defined under applicable Canadian securities legislation (collectively, "forward-looking statements"). These forward-looking statements relate to, among other things, the objectives, goals, strategies, beliefs, intentions, plans, estimates and outlook of Cardinal Resources. Ltd ("Cardinal Resources" or the "Company"). Forward-looking statements can generally be identified by the use of words such as “believe,” “anticipate,” “expect,” “intend,” “plan,” “goal," "will," "may," "target,” “potential" and other similar expressions. In addition, any statements that refer to expectations, projections or other characterizations of future events or circumstances are forward-looking statements. Forward-looking statements are based on estimates and assumptions made by Cardinal Resources in light of its experience and perception of historical trends, current conditions and expected future developments, as well as other factors Cardinal Resources believes are appropriate in the circumstances. These estimates and assumptions are inherently subject to significant business, economic, competitive and other uncertainties and contingencies, many of which, with respect to future events, are subject to change. Although Cardinal Resources believes that the expectations reflected in such forward-looking statements are reasonable, undue reliance should not be placed on such statements. In making the forward-looking statements in this presentation, Cardinal Resources has made several assumptions, including, but not limited to assumptions concerning: production costs; statements with respect to the future price of gold, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements of additional capital, government regulation of mining operations, environmental risks, costs of closure of various operations and changes to the political stability or government regulation in the country in which Cardinal Resources operates . Actual results may differ materially from those expressed or implied in the forward-looking statements contained in this presentation. Important factors that could cause actual results to differ materially from these expectations are discussed in greater detail under the heading "Risk Factors” in Cardinal Resource's annual information form for the current year available on www.sedar.com. When relying on forward-looking statements to make decisions with respect to Cardinal Resources, carefully consider these risk factors and other uncertainties and potential events. Cardinal Resources undertakes no obligation to update or revise any forward-looking statement, except as required by law. Although Cardinal Resources has carefully prepared and verified the Mineral Resource and Ore Reserve figures presented herein, such figures are estimates, which are, in part, based on forward-looking information and no assurance can be given that the indicated level of gold will be produced. Estimated Mineral Resources and Ore Reserves may have to be recalculated based on actual production experience. Market price fluctuations of gold as well as increased production costs or reduced recovery rates and other factors may render the present Probable Ore Reserves unprofitable to develop at a particular site or sites for periods of time. PRE-FEASIBILITY STUDY - CAUTIONARY STATEMENT (REFER PRESS RELEASE DATED 18 SEPTEMBER 2018) The PFS is based upon a Probable Ore Reserve derived from Indicated Mineral Resources. No Inferred Mineral Resources have been included in the estimation of Ore Reserves. The Company advises that the Probable Ore Reserve provides 100% of the total tonnage and 100% of the total gold metal underpinning the forecast production target and financial projections. No Inferred Mineral Resource material is included in the Life of Mine plan. The PFS is based on material assumptions outlined in the PFS Report. The Company has concluded it has a reasonable basis for providing the forward-looking statements in this document. ASX/TSX: CDV | 20

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Q4 & FY22 - Investor Presentation image

Q4 & FY22 - Investor Presentation

Financial Services

FY23 Results - Investor Presentation image

FY23 Results - Investor Presentation

Financial Services

Ferocious - Plant Growth Optimizer image

Ferocious - Plant Growth Optimizer

Agriculture

Market Outlook and Operational Insights image

Market Outlook and Operational Insights

Metals and Mining

2023 Investor Presentation image

2023 Investor Presentation

Financial

Leveraging EdTech Across 3 Verticals image

Leveraging EdTech Across 3 Verticals

Technology

Axis 2.0 Digital Banking image

Axis 2.0 Digital Banking

Sustainability & Digital Solutions

Capital One’s acquisition of Discover image

Capital One’s acquisition of Discover

Mergers and Acquisitions