Investor Presentaiton

Made public by

sourced by PitchSend

3 of 31

Creator

PitchSend logo
PitchSend

Category

Pending

Published

Unknown

Slides

Transcriptions

#1WEST HIGH YIELD RESOURCES 3.0122 magnesium 12 Mg 24.305 NIME GOLD 888.8 A UNIQUE MAGNESIUM AND GOLD OPPORTUNITY IN BRITISH COLUMBIA COMPANY PRESENTATION TSX: WHY.V WWW.WHYRESOURCES.COM#2DISCLAIMER WEST HIGH YIELD RESOURCES Disclaimer and Forward-Looking Statement No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This presentation includes certain "forward- looking statements". All statements other than statements of historical fact, included in this presentation, including without limitation statements regarding potential mineralization and reserves, exploration results, and future plans and objectives of the Company, are forward-looking statements that involve various risks and uncertainties. The mineral resources estimates contained herein are only estimates and no assurance can be given that any particular level of recovery of minerals will be realized or that an identified resource will ever qualify as a commercially mineable or viable deposit which can be legally and economically exploited. In addition, the grade of mineralization ultimately mined may differ from the one indicated by drilling results and the difference may be material. The estimated resources described herein should not be interpreted as assurances of mine life or of the profitability of future operations. There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company expectations include, among others, risks related to international operations, the actual results of current exploration activities, conclusions of economic evaluations and changes in project parameters as plans continue to be refined as well as future prices of magnesium, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form available on www.SEDAR.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. All figures are in Canadian dollars unless otherwise indicated. WHY.V | October, 2022 2#3WHY WEST HIGH YIELD? MULTIPLE POTENTIAL CASH FLOW GENERATING PROJECTS ADVANCED MAGNESIUM PROJECT WITH ROBUST PEA HIGH POTENTIAL GOLD EXPLORATION AT PAST PRODUCING MIDNIGHT PROJECT HIGH GRADE GOLD MINE REJECTS PROJECT WITH CASH FLOW POTENTIAL GREAT INFRASTRUCTURE STRONG MANAGEMENT AND BOARD#4RECORD RIDGE MAGNESIUM MINE A Unique Investment Opportunity Advanced Project Magnesium Market C • • World Class advanced-stage project expected permit shovel ready in 2022, with robust economics based on KPM PFS-2 Study, showing economics after tax NPV 10% of $1,243 millions and an IRR of 55% 1 Conventional open pit mining operation with potential 43 years mine life¹ High purity (over 99%) MgO and Mg(OH)2 products with Ni, Fe and SiO2 byproducts. Global annual market for all magnesium products exceeding 29M tonnes High purity magnesium oxide is growing globally with CAGR projections of 6% in the next 10 years. High demand for multiple verticals including metals, food and pharma, agriculture, tech, infrastructure, etc. Premium MgO Product Proprietary process producing premium (>99%) MgO and Mg(OH)2 products with nickel and silica byproducts Green process with no waste and little to no emissions. Great Infrastructure • Located near Rossland, BC - one of the best mining jurisdictions in the world Full infrastructure in place including established roads and highways, electrical power, water and natural gas. Local labor and support services in proximity 1. Based on 1M tpy mining operation WHY.V | October, 2022 4#5RECORD RIDGE MAGNESIUM MINE Project Summary OWNERSHIP LOCATION DEPOSITS RESOURCE ESTIMATE PEA RESULTS . • 100% owned by West High Yield Resources Ltd. 8,972 hectares property located 7.5 km air west to southwest of the town of Rossland, B.C., Canada; 5 km north of the U.S.-Canada border, with excellent regional infrastructure including established rail access, roads and highways, electrical power, water and natural gas. Mg mineralization widespread in ultramafic rocks that had undergone serpentinization. Deposits remain open along strike and at depth. M&I resource of 43 Mt ore at 24.6% Mg (43% MgO) grade based on drilling 0.6 km² of the 7.5 km² discovery area implies a world class asset. Updated Optimization PFS-2 completed (2021) highlighting robust project economics with an after-tax NPV 10% of $1,243 Million and IRR 55% over a 43 year mine life Upfront Capital requirements of $325 million • Market Study supports premium MgO (over 99%) pricing outlook with Nickel and Silica credits Premium MgO product supporting top applications including automotive, aerospace, defense, Mg metal and alloys, food and pharmaceuticals, and others. WHY.V | October, 2022 5#6RR PROJECT TIMELINE Advanced stage project EXPLORATION Between 2007 and 2011 WHY conducted exploration including 10,000 metres drilling, 77 holes, all mineralized. RESOURCE ESTIMATE WHY produced NI 43-101 Technical Report initial resource estimate of 39 Million tonnes M&I PEA STUDY PFS REPORTS PFS-Stages-1 and 2 presented an optimized proprietary HCI process with higher product purity and recoveries, thus substantially improving project economics. Final PFS report with demo plant design and techno- economic project study is expected in Q3, 2022 WHY completed NI 43- 101 Technical Report PEA Study and updated resource estimate of 43 Million tonnes M&I. MINING PERMIT 2019 The Company completed Environmental Assessment and Environmental Baseline Study and submitted its Mine Plan Permit Application. Permit is expected in Q4 2022 2007 2009 2013 2019-22 目 2019/22 WHY.V | October, 2022 6#7RR MAGNESIUM MINE Project Location Wells Gray Provincial Park Kamloops Banff National Park Calgary Medicine Hat • Located in a well-established mining district near the town of Rossland, BC Kelowna Lethbridge • Vancouver Coquitlam O Chilliwack Surrey Abbotsford Record Ridge • Bonners Ferry 0 Victoria Bellingham OMt Vernon Port Angeles Everett 0 Cut Bank Colville 5km north of the US - Canada border Supporting industries in close proximity Whitefish O Sandpoint Shelby • Kalispell Conrad Rathdrum Nearby rail access with CP Rail (Trail, BC) 100 mi 100 km Edmonds O Bremerton Seattle Tacoma O Olympia Spokane o Great Falls Washington Coeur Cheney d'Alene . 500km east of the ports of Missoula Yakima ° Pullman Oo Moscow Lewiston Kennewick Longview OWalla Walla Helena • Deer Lodge • Vancouver, BC, and Seattle, WA Skilled labor Excellent infrastructure Anaconda O Butte Rozeman WHY.V | October, 2022 7#8RR PROJECT EXPLORATION PEA NI 43-101 Resource Estimate Updated Resource Estimate (2013) Resource Category Measured Indicated M&I Inferred Contained Mg %Mg Cut-off Total Mt %Mg Grade (Mt) 28.4 24.82 7.05 14.6 24.21 3.54 21.9 43.0 24.61 10.59 1.07 24.37 0.26 • • Over 10,000 metres drilling, 77 holes, all mineralized. Resource remains open along strike and depth covering an area of 600m x 1 km of mineralization inside a 7.5 sq km ultramafic outcrop discovery. Measured and Indicated Mineral Resources include 43 million tonnes averaging 24.6% Mg, using a 21.9% cut-off, totaling 10.6 million tonnes contained Mg 100% ownership of 8,972 contiguous hectares which could support open pit mine and processing facility, with full infrastructure in place bringing huge savings in project capital. CONTAINED RESOURCE 600M X 1KM 7.5 sq km ULTRAMAFIC DISCOVERY WHY.V | October, 2022 8 00#9RR MINE PLAN Proposed Project Plan Based on Project Description Report (Greenwood Environmental, 2022) Powder Magazine WSF Runaway Lane Crusher Parking Area Maintenance Pad Sed. Pond Office Stockpile Top Soil Stockpile Dry Gate Parameter Year 1 Year 2 Operating Days 182 182 Mobile Crusher 250 kt 250 kt Feed Mg Grade 24.5% 27% Waste Stripping 60 kt 40 kt Total Material 310 kt 290 kt Mined Mining Rate 1,700 tpd 1,600 tpd • • • The proposed Project mine plan will be a conventional truck and shovel open pit operation which includes drilling, blasting, loading and hauling of mineralized ore. The mine product material will have primary and secondary crushing on-site before being loaded to the processing facility (location TBD). Facilities that will be constructed include the open pit and adjacent waste rock storage facility, an access road from the Old Rossland Cascade Highway to the mine, a soil stockpile, a level pad for primary and secondary crushing, a maintenance pad, and an office building WHY.V | October, 2022 9#10RR ORE PROCESSING HCI Leaching Process SiO, Section Leaching Serpentin HCI MgO MgO Section SiO2 Product Split Meachanical Upgrading SiO2 Residual Filtration I" MgCl Solution Oxidation/ pH Filtration Precip. pure MgCl, Solution MgC12 Roasting MgO 98% Magnetic Waste NaOH Solution NaOH Leaching Products Not Leachable Was te Filtration Waste Sodium Silicate Solution Intre mediate Material Chem. H,SO, Solution H₂SO, Precipitation Process Na SO, Waste Filtration Solution FeCl, Solution+ free HCI Fe/Ni Section Fe(OH)3 MgO Filter Cake was hing Special Hydration + Drying HCI Releaching Fe203 Hydrolysis Filtration HCI Sparging HCI gas Fe₂O Product H Recale. Mg(OH); FR Quality High Purity CCM Chen Hydration+ Drying Mg(OH); FR Quality Mg Upgrading Section Troubleshooting chem.com www.kon- Developed at KPM lab facility (Kingston, Ontario) Proprietary hydrometallurgical process High purity (over 99% purity) MgO or Mg(OH)2 products and 94.85% recoveries Marketable by-products (Nickel, Silica, Fe) Closed-loop with acid regeneration Low environmental impacts Low energy Virtually no wastes Minimal CO2 emissions Precipitated Silica Filtration NiCl, Product Roasting NiO product WHY.V | October, 2022 10 10#11RR PEA HIGHLIGHTS Robust Project Economics Updated PEA Highlights Based on PFS-Stage 2 (2022) Using HCI Leaching Process¹ Product ▷ >99% MgO >98% MgO Mg Ingot Unit US$ US$ US$ US$ US$ US$ US$ M $2,500 $2,200 $1,800 $2,000 $1,500 $1,000 $6,000 NPV 10% PreTax $ Million $1,715 1,189 $882 $1,185 821 $438 $1,636 IRR Pre Tax % 72% 62% 48% 71% 53% 33% 53% NPV 10% After Tax $ Million $1,243 $844 $616 $848 $577 $291 $1,139 IRR after Tax % 55% 48% 38% 54% 41% 26% 41% Initial Capex $ Million $325 $325 $325 $250 $250 $250 $275 LOM Average Annual tonnes 250K 250K 250K 250K 250K 250K 50K MgO Production LOM average Annual MM tonnes 300 300 300 300 300 300 Mineralization Mined LOM Strip Ratio Waste:Ore 0.8 0.8 0.8 0.8 0.8 0.8 0.8 Mine Life Years 43 43 43 43 43 43 43 Payback Years <2 <3 <3 <2 <3 <3 <2 Net After Tax Income $ Million $174 $152 $122 $145 $110 $73 $219 Year 1 1 Sensitivity analysis based on MgO product price per tonne WHY.V | October, 2022 11#12MAGNESIUM USE 100's of applications in a variety of industries ENERGY STORAGE Supersedes Lithium WALL BOARDS Fire and water resistant PHARMACEUTICAL Vital to human health AUTOMOTIVE Light weight and strength AGRICULTURAL Vital to plant growth AEROSPACE Weight and temperature resistant MG CEMENT More strength and durability WHY.V | October, 2022 12 12#13MAGNESIUM ADVANTAGE Wide use of Magnesium makes it one of the US strategic minerals AUTOMOTIVE Vehicle manufacturers are making lighter cars for more fuel efficiency High growth expectations for Mg metal as it is 33% lighter than aluminum, 75% lighter than steel making Mg the lightest high strength metal of choice for the future of the automotive industry • • • • MG CEMENT Production of Mg cement uses less fossil fuels, and absorbs and locks in CO2 emissions as it sets Non-toxic Higher strength than Portland cement Never rots as it expels moisture • • AEROSPACE AND BATTERIES Lightweight properties of magnesium improve performance of aircraft, vehicles, armor and military equipment. Magnesium batteries have better performance, lower costs, and enhanced safety compared to lithium-ion batteries (Karlsruher Institute fur Technologie (KIT, 2019) AGRICULTURE AND HEALTH Magnesium (in the form of Magnesium Nitrate) is essential for healthy plant growth. Magnesium is vital to human health and is a co-factor in more than 300 essential enzyme systems in the body. WHY.V | October, 2022 13#14World magnesia imports 2018 Total 5.2m tonnes ROW 37% Germany 12% MAGNESIUM MARKET Japan 10% USA 10% Netherlands 9% . MARKET FORCES Magnesium is considered as one of the 35 strategic/critical minerals for the US economic and national security with an Executive order to stockpile. US has announced the Energy Resource Governance Initiative (ERGI) in 2019 to support initiatives with member countries to develop strategic minerals projects. The North American magnesium compounds markets are highly dependent on imports, which represent over 50% of the demand (USGS, 2017). US production of caustic and refractory magnesia is declining, and consequently imports are expected to be on the rise. France. 3% Taiwan 5% Ukraine. Austria 3% S. Korea Poland 3% China 4% 5% 4% Source: data from ITC; Dr Richard Flook WHY.V | October, 2022 14#15MAGNESIUM MARKET Global MgO Market Share by Industry 2019 (%) Refractories Industry Others Agricutural Industy Chemical Intermediates www.marketintellica.com MARKET VALIDATION Current global annual market for all Mg products exceeds 29M tonnes. Focus is on the following industries including government and military: Pharmaceutical Companies • Magnesium Ingot Bar Suppliers Potential EV Battery Companies (currently under R&D) • Fertilizer Companies Health and Dietary Supplement Companies Magnesium Food Grade Suppliers Magnesium Wallboard Rail Car, Aerospace, Military, Commercial Transportation Magnesium Cement/Ceramics WHY.V | October, 2022 15#16WORK PLAN SHORT TERM • Developing demonstration plant Budget of $15-$20M with potential 75% Federal/Provincial Government funding and 25% company funding Commissioning in 12-14 months Forming Project Consortium . Consortium members include WHY Resources; Government Funding Agencies; Private Funding; Lab facility and consultants; and End users LONG TERM Budget of $325M Commercialization (18-24 months) Feasibility Study of the commercial plant • • FEED Study • Engineering and procurement Execution of the commercial plant (24-30 months) • Construction Commissioning WHY.V | October, 2022 16#17DEMONSTRATION PLANT SEMI COMMERCIAL Operating at 1 tph Achieving all technical objectives • Mitigating the risks associated with the scale- up to the commercial facility Generating sufficient engineering data for a full Feasibility Study (FS) including a comprehensive technology overview and operational engineering factors Generating cash flow . Gross Annual Revenue: >$15M EBITDA: $7.5M Supporting the hiring of 15-20 full-time employees during the operation stage Operating until the successful commissioning of the 1st commercial plant. Budget of $15-20M WHY.V | October, 2022 17#18PROJECT SCHEDULE Short and Long Terms MTHS # Milestones DEMO PLANT 36 M1 Engineering and Procurement M3 Commissioning M4 Operation M5 Disassembly COMMERCIALISATION 42 Engineering and Procurement M6 Feasibility and Engineering Procurement M7 Execution Construction Commissioning Operation 22 2023 2024 2025 2026 2027 2028 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 WHY.V | October, 2022 18#19PRODUCTION OUTLOOK Mg Industry Product Verticals 1. Magnesium Oxide DODGER 2. Magnesium Nitrate Fertilizer || • • The company will specialize in the mining and production of high purity MgO product The company will JV/Partner with other parties/end users to develop multi Mg industry verticals 3. Wallboard Plant !!! 4. Cement Plant IV 6. Mg Ingot Plant V I. WHY can produce MgO that is up to 99% purity with no CO2 emissions IV. from the production process. II. Mg is a vital nutrient for healthy plant growth. It is a key component of the chlorophyll molecule III. Mg Wallboard plant can replace OSB board, plywood, drywall and cement board. It is fire proof, smoke proof, water proof, mould and mildew proof and termite proof. V. No CO2 emissions, Mg cement PSI strength ranges from 9,000 to 45,000; Mg cement lasts for 3,000-5,000 years; and it absorbs and locks it CO2 emission as it sets and cures. Mg ingots are the lightest and strongest based on weight to density ratio, lighter by 33%, which results in lower CO2 emissions in all uses. WHY.V | October, 2022 19#20MAGNESIUM AND GOLD Near Term Strong Cash Flow Projects ADVANCED MAGNESIUM PROJECT AT PERMIT STAGE MGO HIGH GRADE DEMONSTRATION PLANT GOLD MINE REJECTS PROJECT RECORD RIDGE MAGNESIUM PROJECT 2022 2022 Advanced world-class project expected permit ready in 2022 and ready to mine in 2023. Selling high grade Mg ore to multiple Mg refineries HIGH GRADE GOLD MINE REJECTS PROJECT • Permit ready with over 200K metric tons grading at average 2.5 ppm Au, for a total of >18K ounces of gold and >$30M value. HIGH PURITY MGO DEMONSTRATION PLANT 1 tph demonstration plant based on proprietary process Processing annually over 16K MT of Mg ore and producing over 6K MT of high purity MgO product with gross revenue over $15 M#21KOMATSU 730 KOM AT SU MOMATSU 690 60 KOMATSU MINING MAGNESIUM ORE Company signed Future Contract LOI with Galaxy Magnesium in Dec 2021 for the sale of 234K tpa of Mg ore at $500/Mt • Mine construction following provincial permit approval; Mine production of 250 ktpa to start in 2023; Attractive economics and rapid payback with massive competitive advantages over other deposits; Open Pit high grade, oxide rich deposit with exceptional mineralogy and free of harmful contaminants (asbestos, etc.) Low Capex $5M due to existing infrastructure; Opex $20/t with contracted seasonal mining/crushing operation; Signed Future Contract LOI with Galaxy Magnesium for the sale of 234K tpa of Mg ore at $500/Mt FOB Rossland, BC, resulting in EBITDA of over 110$M. Recent corporate market cap suggests this attractive project is deeply discounted despite substantial de risking from a resource, permitting and planning perspective; Mine Quarry expansion in year 2 for 1.0 Mtpa. WHY.V | October, 2022 21#22GOLD MINE REJECTS PROJECT GRADE 1 AND TONNAGE 2 • Over 225K metric tons of mine rejects already mined from the many historic mines in the area Average grade of 2.5 ppm Au Over 18K ounces of gold with over $30M value. 1. 2. Grade is based on assay results by MetSolve of 99 bulk samples taken randomly throughout the mine rejects stockpile Based on tonnage evaluation conducted by independent Q. Geologist WHY.V | October, 2022 22 22#23View of the Conceptual Underground Design (drifts shown in brown, stopes in blue, topography in green and drillhole traces) MIDNIGHT PROJECT High Potential Gold Exploration Company secured $2.5M flow through funds in Dec 2021. Drilling started on the property in late April with plans to conduct 15,000m exploration/drilling during 2022. DEEP DRILLING AT THE MIDNIGHT CLAIM • High potential of finding high-grade gold mineralization based on historical data Following up on 2008 drilling results, WHY received drilling permit in 2021 for a 22-hole drill program totaling 15,000 meters (58,000 feet) on the Midnight claim at 600 meters per hole in an attempt to reach the mother load. WHY.V | October, 2022 23#24• The Midnight area contains primarily narrow and erratic but high-grade quartz -carbonate veins with native gold and minor silver and sparse sulphides Company's senior geology consultants support the theory that the series of gold-enriched quartz veins and gold bearing serpentinites identified by the drill holes to date, have been enriched from a contained deeper source The Company planned the next drill holes to be drilled to a depth of at least 600 metres per hole. Drilling is expected in Spring 2022. Geological Cross Section at the Midnight Mine area C MIDNIGHT MINE AREA Geological Settings Geology and drill holes at the Midnight Mine area CHRISTINE LOT 1219 VOLCANICS SNOWDROP PROPERTY BOUNDARY LOT 3013 6000 FT 4000 FT 2000 FT. OK FAULT MIDNIGHT Je11d Em MARRON VOLCANICS JUMBO FAULT Volcs VOLES Je10a Pmr Mt. Roberts Sediments Jrd ULTRAMAFICS Ec CORYEL INTRUSIVE ROSSLAND VOLCANICS LOOKING NORTHWARD. Jdi ROSSLAND SILL AND MONZONITE SKETCH OF GEOLOGY AT MIDNIGHT MINE ADAPTED FROM HOY AND DUNNE. BULLETIN 109 Jm OK. LOT 678 IXL WORKINGS OK WORKINGS SCALE BAR APPROX 200) METERS ⚫GOLDEN BUTTERELY GOLDEN LOT 539 NOT OWNED DRIP ITALIAN PORTAL NORTH VEIN BAKER ZONE SUNNYSIDE LOT 1503 MIDNIGHT MIDNIGHT 3100 PORTAL LOT 1186 MBO NO.: COUNTESS LOT 1201 -LOT 3218 ULTRAMAFICS LITTLE DALLES LOT 1215. BRYAN LOT 1827 AETNA FR LOT 3782 BIG BEND LOT 3502 MIDNIGHT MINE AREA, ROSSLAND B.C./ WHY.V | October, 2022 24 24#25MIDNIGHT MINE AREA Past Production and Drilling Highlights Recorded past production from the combined WHY Resource's properties up to 1941 CLAIM TONNES GRAMS AU GRADE Au g/t OUNCES Au Grade Au OPT IXL 5248 809766 154 25912.5 4.49 MIDNIGH 4760 218346 46 6987.1 1.34 T OK 293 TOTAL 10301 17916 1046028 61 101.5 573.3 33472.9 1.78 2.96 Highlights of the high-grade Au results from WHY Resources' 2008 drill program at the Midnight property Hole From To Comments Depth (m) Width Grade (m) Au (g/t) MN 09-4 123 31.3 39.4 8.1 12.2 MN 09-15 106 13.9 18 4.1 40.11 MN 09-6 121 13.6 26.8 13.2 7.40 (Listwanized serpentinite (8 g/t Ag including 85.48 g/t Au and 58.2 g/t over 1 m and ...m, respectively) (Green serp. & soapstone (19.7 g/tonne Ag including 198 g/t Au over 0.8 m) (Mixed Qtz + listwanized serp. 4.4 g/t Ag including 38.21 g/tonne Au & 53.3 g/tonne Au over 0.6 m & 0.5 m, respectively) WHY.V | October, 2022 25#26CORPORATE PROFILE TSXV: WHY Venture Exchange Listing TSX: WHY SHARES OUTSTANDING 81.1M 52 Week High-Low $0.07 - $1.22 WEST HIGH YIELD RESOURCES FULLY DILUTED 92.7M INSIDER OWNERSHIP 37% {2} DEBT & CASH $3.7M $2M MARKET CAPITALIZATION $34.5M WHY.V | October, 2022 26#27OUR PROFESSIONAL TEAM FRANK MARASCO CEO, DIRECTOR Frank Marasco is also President and Director of Big Mountain Development Corp. Ltd. Over the course of 45 years, Frank has built and sold numerous successful businesses, in Retail, Hospitality, and Commercial Real-estate. Frank's experience in resource development outside of his 16 years leading WHY Resources is based in the oil and gas sector. He had purchased 81 oil and gas development sections in S.E. Saskatchewan in the Bakken, as well as thirteen gold mines in Rossland, BC. PAT NELSON DIRECTOR Ms. Nelson was the Vice Chair and Director of the In Situ Oil Sands Alliance, the Controller for Sabre Petroleum and also Petroterra Resources. She also served as the Manager of Financial Control for Suncor Inc. She is a currently a member of the Board of Directors of Altalink, and also Optiom Inc.. Mrs. Nelson served 15 years as an elected Member of the Legislature of Alberta, and was appointed as the Minister of Energy, the Minister of Economic Development and Tourism, the Minister of Government Services, and finally the Minister of Finance. MARIA MARASCO DIRECTOR Mrs. Marasco is an independent businesswoman who has provided services in corporate restructuring finance, acquisitions, and strategic planning. She is also responsible for overseeing management information systems, human resource strategies, and property management systems BARRY BAIM DIRECTOR Mr. Baim brings over 35 years activating and inspiring teams to achieve profitable revenue growth. His senior experience is diverse having held executive positions with both private and public companies including Tier one CPG and in the natural resource sector mining site development projects in oil sands and other service-related entities in energy, oil, and gas. Mr. Baim is currently a director for SGV Canada and a past board member with Millennium Seismic, Paradigm Chemical Technologies and Siksika Resource Developments Ltd. FOUAD KAMALEDDINE PHD, P.ENG, ADVISOR Dr. Kamaleddine is the founder/principal of AIS Inc., an integrated mining consulting partnership that provides technical services to mining companies including processing and metallurgy, project development, and engineering studies. He has been an officer and director of many public and private mining companies. Dr. Kamaleddine has over 20 years of academic and industry experience with demonstrated success in conducting challenging industrial research leading to several inventions and multiple achievement awards. WHY.V | October, 2022 27#28WHY INVEST IN W.H.Y RESOURCES? Multiple Stream of Revenue Potential MAGNESIUM HIGH GRADE MINIING REJECTS GOLD EXPLORATION AT MIDNIGHT CLAIM WHY will produce low cost, high purity, and high margin magnesium products for all industry vertical applications generating diverse revenue with its robust economics After Tax NPV of $1,243 Million with an IRR of 55% Upfront Capital of $325 MM Shovel ready open pit mine ideally situated in a mining jurisdiction with all required infrastructure Global demand is accelerating with the USA seeking to stockpile magnesium Semi Commercial Demonstration plant Generating cash flow of Gross Annual Revenue: over $10.95M & EBITDA of $6:45M Over 225K metric tons of mine rejects already mined, from the many historic mines in the area Average grade of 2.5 ppm Au Over 18K ounces of gold with over $30M value. High potential of finding high- grade gold mineralization based on historical data Secured $2.5M flow through funds in Dec 2021 and initiated 15,000m exploration/drilling in late April 2022 ✓ Historical gold production and 2008 drill hole results reinforce the high potential of the claim and the current 22-hole drill program in 2022. WHY.V | October, 2022 28#29CONTACT US West High Yield (W.H.Y.) Resources Ltd TSXV: WHY Frank Marasco, President and CEO Email: [email protected] Office: (403) 660 3488 Fax: (403) 206 7113 PO Box 68121 Calgary, Alberta T3G 3N8 www.whyresources.com

Download to PowerPoint

Download presentation as an editable powerpoint.

Related

Q4 & FY22 - Investor Presentation image

Q4 & FY22 - Investor Presentation

Financial Services

FY23 Results - Investor Presentation image

FY23 Results - Investor Presentation

Financial Services

Ferocious - Plant Growth Optimizer image

Ferocious - Plant Growth Optimizer

Agriculture

Market Outlook and Operational Insights image

Market Outlook and Operational Insights

Metals and Mining

2023 Investor Presentation image

2023 Investor Presentation

Financial

Leveraging EdTech Across 3 Verticals image

Leveraging EdTech Across 3 Verticals

Technology

Axis 2.0 Digital Banking image

Axis 2.0 Digital Banking

Sustainability & Digital Solutions

Capital One’s acquisition of Discover image

Capital One’s acquisition of Discover

Mergers and Acquisitions